16mm - 32mm Pvc Pipe Extrusion Line , Pvc Conduit Pipe Four Strand Production Line
Production line composition
HYPET advantages of 16-32mm PVC Four head conduit line
Configuration list
Note: This table as attached file, which is for selection of the configuration on the whole line
SN | Items | Choosing configuration | Remark |
1 | Production control system | PLC control system for whole system | |
2 | Cooling system of the main control electric cabinet | Fan cooling electric cabinet | |
3 | Main motor | AC motor with famous inverter | |
4 | Pressure sensor | HYPET individual temperature and pressure control in two parts | |
5 | Core thermoregulation control | Internal closed loop heat balancing system. | |
6 | Material of screw & barrel type | Nitro Alloy with bi-metal in two parts | |
7 | Quantitative feeding system’s mixing function | Twin screw with mixing device option | |
8 | Pipe calibrator sleeve | Copper calibrator sleeve | |
9 | Cutter | Dustless type in new technology |
Condition of use
1. Technical features of whole line
SN | Specification | Description | Remark |
1 | Suitable material | PVC powder | |
2 | Pipe diameter range | Four pipe Ø16-Ø32mm. (1/2”-1 1/4’) | |
3 | Production speed | 1.2~12 m/min | |
4 | Max. output | 320kg/h | |
5 | Test and accept | Based on HYPET standard formula. | |
6 | Center height | 1,000mm | |
7 | Whole line size (L x W x H) | 18,000 x 1,200 x 2,200mm | |
8 | Operation direction | From right to left | |
9 | Color of equipment | HYPET white color | |
10 | Control of whole production | Refer to the “configuration list”. | |
Note | Extrusion capacity will be changed according the processing material and working conditions |
Terms & conditions
1. Installation and debugging
When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved, in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.
1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.
2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.
3) This Price does not included commission and installation in buyer’s factory.
2. Pricing
1) The above mentioned quotation is valid within 30 days counted from the issue date of quotation.
2) The price and machinery configuration should be updated and confirmed by the Seller in the case that the quotation has been beyond the validity period.
3) The above mentioned quotation is based on Ex works. Sea transportation and wooden case packing is excluded.
4) The price does not cover the cost of testing material. The testing material will be supplied by the Buyer. Or the Seller will purchase the material as requested by the Buyer at Buyer's cost.
5) The price does not include the cost of commissioning at Buyer's site.
The Seller reserves the right to modify the specification and design of the machine in order to enhance the product quality.
3. Terms of payment
1) T/T and L/C (irrevocable, at sight) both are acceptable.
2) 30% of the total contract value should be paid in advance by T/T, balance 70% of the total value is to be paid before shipping at the Seller’s factory, we accept both T/T and L/C 90 days.