Double Screw Extruder Machine / Twin Screw Extruder Machine ZS51/110
Double Screw Extruder Machine / Twin Screw Extruder Machine Special features:
Double Screw Extruder Machine / Twin Screw Extruder Machine Specification
SN | Parts name | Specification | Description |
1 | Extruder | Extruder model | HYZS-51/110 conic twin screw |
Output | 100-150kg/h | ||
Center height | 1000mm | ||
Weight | 2200kg | ||
2 | Screw | Diameter | ø51/110 mm |
Material | 38CrMoAlA + special alloy | ||
Finish | Nitrogen-filled (0.50~0.70mm depth) and polish | ||
Rotate speed | 0~38 r/min | ||
Core of the screw | Auto control for temperature | ||
3 | Barrel | Material | 38CrMoAlA with bi-metal type |
Inside finish | Nitrogen-filled (0.50~0.70mm depth) and rubbing | ||
Heating control area | 4 areas | ||
Heating way | Cast aluminum/ ceramics | ||
Heating power | 20 kW | ||
Cooling system | Low-noisy barrel cooling fan | ||
Cooling power | 0.25kW x 2 sets | ||
4 | Gear box | Housing material | Ductile iron QT-500 |
Gear material | 20CrMnTi | ||
Gear surface | Hardened and ground in high precision | ||
Axis material | 40Cr | ||
5 | Twin screw Dosing feeder | Supplying material motor | 1.1 kW |
Speed range | 1-50 RPM | ||
Inverter | ABB | ||
6 | Vacuum degas with selector | Vacuum degree | -0.004Mpa |
Motor power | 1.1 kW | ||
7 | Driving motor | AC motor power | 22 kW |
8 | Electrical Control system | Detachable control panel | Siemens PLC |
Extra temperature zone for die head | 5 zones | ||
Components brand | Siemens, RKC, ABB, etc. |
Double Screw Extruder Machine / Twin Screw Extruder Machine HYPET Conic twin screw extruder Model list
Model | 35/78 | 45/100 | 51/110 | 55/120 | 65/132 | 80/156 | 80/173 | 92/188 | 95/192 |
Max output | 50 | 110 | 150 | 230 | 330 | 540 | 650 | 800 | 1000 |
Main motor | 11 | 18.5 | 22 | 30 | 30 | 55 | 75 | 110 | 110 |
Double Screw Extruder Machine / Twin Screw Extruder Machine Other terms
1. Training and services
1) Instruction of field installation
2) Equipment field debugging and trial run if required by the buyer according to the rule.
3) Training on field operation and maintenance for customer's personnel.
4) Provide technical consultation service on long-term basis.
2. Installation and debugging
When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved,in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.
1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.
2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.
3) This Price does not included commission and installation in buyer’s factory.
3. Time of delivery
1) When the contract becomes valid, the machine should be delivered within 60 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.
2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.
4. Debugging charge
The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (100USD/day).
5. Guarantee clause
1) Guarantee is 1 year (excluding human factor and wearing parts).
2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.