New Design high speed automatic plastic bottle cap slitting machine
The Slitting machine is designed and developed to provide security ring cutting for security caps. This machine is equipped with a series of all-auto technological processes, such as automatically putting cap in proper position, delivering cap, notching cap, disengaging caps, etc.
Full-Automatic High Speed Cap slitting machine for cutting caps to form tamper evident band
Production: We will be according to your cap shape to design the cap slitting machine include the slider,
die heads, holder and sorting bin.
Production capacity(30x20size) 15000-18000caps/hour for 2die heads
25000-30000pcs/hour for 4die heads
35000-40000pcs/hour for 6die heads
Installed electrical power:4kw(50hz/60hz)
Absorbed electrical power(appr.):0.6kw
Compressed air consumption: 80-120NL/min
Slitting machine specification | |||
Type | LT-28 | Total power | 0.7KW |
Cap diameter | 18mm-60mm | Supply voltage | 220V,50Hz |
Cap height | 12mm-50mm | Compressed air consumption | 0.5m³/min |
Capacity | 15000-20000pcs/hr | Machine weight | 160KG |
Installed electrical power | 1KW | Size(L*W*H) | 1700mm*700mm*1250mm |
TERMS | |
PRICE TERMS | EXW price |
PAYMENT TERMS | T/T 30% for deposit,70%balance after BUYER approve all the machine and before shipment |
DELIVERY |
Upon receipt of deposit, all machines need 50-55 working days to be completed. |
PACKING | Standard Sea Shipping Packing |
GUARANTEE | During normal operation, 18 months guarantee period is valid for all machines. |
AFTER-SALES SERVICE
|
• When the above listed machines are completed, the Buyer shall dispatch their qualified engineers to inspect their machines in manufacturer’s factory. The produced plastic caps from these machines should be checked against with the samples which given by the Buyer before, and inspect approval by buyer. • When the inspection, testing is done, the Seller will ship machines ASAP. • Upon arrival of the machines at the Buyer’s factory, the Seller shall dispatch an engineer to the Buyer’s factory to install, debug the machines until all machines can produce qualified plastic caps. And the engineer also should train their technician to operate machine. • Engineer’s tour including round-trip air tickets, lodging, boarding and transportation will be borne by the Buyer. • Time for installation and debugging in Buyer’s factory: 5-7DAYS
|