High Speed Automatic plastic Lip cap Slitting cutting machine price
1. Introduction of cap slitting machine:
Cap slitting machine is mainly applied to plastic caps with tamper evidence of various bottled water and drinks.This series of cap slitting machine has the advantages of:
1) High capacity.
2) High quality,stable,long service life.
3) Intelligent.
2. Technical Data of cap slitting machine:
Power:3KW.
Voltage&Frequency: 380V,50Hz(Customized)
Max capacity:30000-70000pcs/h
Air consumption: 6-8Mpa,0.5m³/min
3. Application Range:
Matched with cap compression molding machine or cap injection moulding machine, cap slitting machine is apply to all kinds of plastic bottle caps molding with tamper evident band.
Slitting machine specification | |||
Type | LT-28 | Total power | 0.7KW |
Cap diameter | 18mm-60mm | Supply voltage | 220V,50Hz |
Cap height | 12mm-50mm | Compressed air consumption | 0.5m³/min |
Capacity | 15000-20000pcs/hr | Machine weight | 160KG |
Installed electrical power | 1KW | Size(L*W*H) | 1700mm*700mm*1250mm |
TERMS | |
PRICE TERMS | EXW price |
PAYMENT TERMS | T/T 30% for deposit,70%balance after BUYER approve all the machine and before shipment |
DELIVERY | Upon receipt of deposit, all machines need 50-55 working days to be completed. |
PACKING | Standard Sea Shipping Packing |
GUARANTEE | During normal operation, 18 months guarantee period is valid for all machines. |
AFTER-SALES SERVICE
|
• When the above listed machines are completed, the Buyer shall dispatch their qualified engineers to inspect their machines in manufacturer’s factory. The produced plastic caps from these machines should be checked against with the samples which given by the Buyer before, and inspect approval by buyer. • When the inspection, testing is done, the Seller will ship machines ASAP. • Upon arrival of the machines at the Buyer’s factory, the Seller shall dispatch an engineer to the Buyer’s factory to install, debug the machines until all machines can produce qualified plastic caps. And the engineer also should train their technician to operate machine. • Engineer’s tour including round-trip air tickets, lodging, boarding and transportation will be borne by the Buyer. • Time for installation and debugging in Buyer’s factory: 5-7DAYS
|
Main pictures: