In Mold Injection Function Labeling Machine For Different Bottles
Introduction
In-mold decorating is a process for producing in-mold labels and graphics within a plastic enclosure. This in-mold labeling process usually takes place during the plastic injection molding cycle.
In-mold decorating takes place when a preprinted label or decorated piece of labeling plastic is inserted in the open plastic injection mold and held in place via vacuum ports, electrostatic charge or another method. The plastic injection mold is then sealed, and plastic resin is then injected to mold the part, which encapsulates the decoration, or label, permanently within the finished injection molded part.
Features
There are numerous advantages associated with in-mold decorating and in-mold labels. This type of permanent graphics technology provides increased design flexibility and productivity over other methods. This includes the use of multiple colors, effects and textures in a single operation, long-lasting and durable graphics, and overall labeling and decorating cost reductions.
In-mold decorating, which provides enhanced graphics in plastic, provides complete labeling and decorating within the complete plastic injection molded process. This means that secondary operations are no longer required, which eliminates post-molding labeling, decorating labor and equipment costs.
Applications
In-mold labels and decorating plastic is used for a wide range of industrial applications, some of which include:
Parameter
Description | Automatic labeling machine machine |
Surface NO. | 2 surface |
Main Specifications | HIM--special PC for IML(American INTEL chipset) servo Motor --Japan SINO(or Taiwan DongYuan) Ball screw and guide rail--ABBA High-precision vacuum generator--Germany FESTO Air valves--TAIWAN Airtac |
Size | 1420×860×1560(mm) |
Weight | 450kg |
Power | 400W |
Air pressure | 0.4~0.8MPa |
Time of labeling | 1.9~5s |
Precision of labeling | +-0.15mm |
Size of container being applied to | 0.1L~10L |
Lead Time | 15-20days |
Warranty Period | 2 year |
Payment Terms | 30% T/T down payment, 70% T/T paid off after samples approval before mould delivery |
Price Lalid Time | 30 days |
Remarks | When special product , please inform us in advance. |