Plastic PE Pipe Extrusion Line / SDpecial Design Water Pipe Production Extruder / PE Water Pipe Making Machine
Quick detail:
1. PPR pipe plastic extrusion machine production line 16-63mm 63-160mm
PPR plastic pipe machine extrusion line is mainly composed of single screw extruder SJ-65/30 or SJ-90/30, single screw extruder SJ25/25 for mark line, die head and moulds with sizing sleeve, vacuum sizing equipment, sprinkling cooling water tank, haul off, cutter, reversal stacker, etc
2. We have one layer PP-R pipe plastic machine and multi-layers reinforced PP-R pipe plastic machine.
Usual sizes for PPR one layer pipe is from 20mm to 63mm, 40-160mm.
Description:
1. HDPE/PPR/LDPE series plastic pipe extrusion line is mainly used in the area of agricultural water supply, architectural water supply, gas supply and transportation, telecommunication cables etc. This line has the advantages of easy operation, high automatic degree, stable and reliable production, well received by customers.
2. FEATURES OF THIS LINE
Raw material + additive → mixing → vacuum feeding machine → hopper dryer → single screw extruder → color code extruder → mould and calibrator → vacuum forming machine → cooling tank → haul off machine → cutting machine → stacker
Production Line Strucure
Model number | PPR-16/63 | PPR-20/110 | PPR-50/160 |
Pipe diameter | 16-63mm | 20-110mm | 50-160mm |
Max output | 150kg/h | 150kg/h | 250kg/h |
Production rate | 5-15m/min | 2-12m/min | 2-10m/min |
Extruder model | SJ-65/33 | SJ-65/33 | SJ-75/33 |
Installed power | 100kw | 110kw | 150kw |
Center height | 1000mm | 1000mm | 1000mm |
Installation area | 35*3.0*2.0m | 38*3.1*2.2m | 38*3.2*2.2m |
Technical and after-sales service:
The supplier the following technical and after-sales service commitment
A) Provide on-site installation guide;
B) Responsible for the commissioning of equipment;
C) Responsible for the buyer's personnel mount guard before the operation and maintenance training;
D) One year free warranty (due to the buyer's improper operation caused by damage charge costs), and ensure the supply of spare parts for a long time, only receive the cost.
E) Provide technical advisory services for a long time