Plastic Corrugated Pipe Extrusion Line , PE Double Wall Corrugated Pipe Production Line , Corrugated Pipe Making Machine
Quick detail:
HDPE Double Wall Corrugated Pipe Production Line
We supply the double wall corrugated pipe extrusion lines with
the pipe of diameter from 110mm up to 1200mm
The Extrusion Line includes equipments as below,
1. SJ90× 36 Single Screw Extruder (for the outer wall extrusion)1 set
2. SJ75× 36 Single Screw Extruder (for the inner wall extrusion) 1 set
3. BW-500 high-speed water cooling corrugator 1 set
4. CWT-500 cooling water tank 1 set
5. C-500 automatic dustless cutting machine 1 set
6. Stacker 1set
7. Die head and mould blocks (110, 160, 200, 250, 315, 400, 500mm)7 sets
8. Electronic Control System 1 set
Description:
1. The advantages of this product are light weight , high corrosion resistance, cooling and heat resistance.
2. Qingdao Aorui Plastic Machinery Co., Ltd developed the new generation double wall corrugated pipes line combining with current technology features. The features of production line are: Double-layer socket, unique socket structure, stable production, high efficiency, horizontal mould block and water circulation for cooling.
3. HDPE double wall corrugated pipe is widely used for drainage, waste water and sewage, also can be widely used in communications, telecommunications, and cable lying.
It can be put sealed rubber ring in the troughs of the pipe’s two sides. It has a very good waterproof seal. Double wall corrugated pipe can be laid in poorer sections of the geological and used for faster construction.
.Production Line Strucure
Extruser | SJ-90/30B | SJ-65/30B |
Die(mm) | Ø75-200 | Ø50-150 |
Sizing Water Tank | SGZL-200 | SGZL-150 |
Hauling Machine | SLQ-200 | SLQ-150 |
Winder | SQ-200 | SQ-150 |
About Our Company:
1. Experience: our company have more than 15 years experence in designing and manufacturing the extrusion equipment.
2. Market: Our products have sold to all over the China exported to all over the world, such as Russia,Kazakhstan, America ect.
3.After Sales Service: We offer turnkey project,technicians will be sent to buyer's factory for installation and commissioning of the equipmnet and training of workers;all you maintenance requirements to equipment will be replied within 24 hours.