PE PPR PVC Twin Screw Extruder Plastic Pipe Production Line , PVC Plastic Pipe With CE ISO9001 Certificate
Quick detail
1. This machine is mainly used to produce agricultural/water supply/drainage pipes, architectural water supply/drainage pipes, cable laying pipes etc. This PVC pipe extrusion line adopts advanced design concept to ensure the efficient extrusion of PVC powder, combined with the unique concept of plasticization screw design to ensure uniformity of plastic extrusion, high capacity production.
Description:
AORUI series PVC Pipe Production Line is mainly used in the production of agricultural drainage, water supply and drainage, and cable laying,etc. purposes. The unit consists of conical double/ parallel double extruder, mold, vacuum forming tank, multi-claw haul-off machine, planetary(chipless) cutting machine, stacker and so on. And the line can be equipped with Comptroller thickening instrument or computer inkjet printer, etc. to achieve the production and manufacture of high-grade tubing.
Main Technical Parameter
Model/data | Pipe diameter | Extruder model | Speed | Max capacity |
FP63 | 16-63mm | LSZ51/105 | 1-10m/min | 120kg/h |
FP160 | 75-200mm | LSZ65/132 | 1.5-5m/min | 260kg/h |
FP400 | 200-400mm | LSZ80/156 | 0.5-1.5m/min | 400kg/h |
FP630 | 400-630mm | LSZ92/188 | 0.1-0.8m/min | 650kg/h |
Main advantages:
experience:Our company have more than 15 years’ experience in designing and manufacturing the extrusion equipment; the core technology and equipment are communicating and docking with the advanced European plastics processing technology
Market: Our products have been sold to all over the China and exported to countries all over the world, such as Russia, Ukraine, Armenia, Azerbaijan, Uzbekistan, Kazakhstan, Italy, Romania, Australia, Turkey, Iran, Pakistan, India, Bangladesh, Indonesia, Japan, Vietnam, Mexico, Venezuela, Brazil, Peru, South Africa, Egypt, Tunisia, and so on.
After Sales Service: We offer turnkey project,technicians will be sent to buyer's factory for installation and commissioning of the equipmnet and training of workers;all you maintenance requirements to equipment will be replied within 24 hours.