Prefab Storage Shed Steel Structure Warehouse Prices Construction Design Steel Structure Warehouse Metal Building
Why Choose Us
1.Advantage of raw material for H beam, steel channel bar, steel c purlins.
2.Own independent design team for meeting customer's special requirements.
3.Steel manufacturer with transportation team to insure fast delivery time and saving sea freight cost.
Product Description
Main Steel | Q345, Q235, Q345B, Q235B etc. |
Column & Beam | Welded or Hot rolled H-section |
Connection method of steel structure | Welding connection or bolt connection |
Wall & Roof | EPS, Rockwool, PU sandwich, corrugated steel sheet |
Door | Rolled up door or Sliding door |
Window | Plastic steel or Aluminum alloy window |
Surface | Hot dip galvanized or painted |
Company Introduction
1.More than 20 years export experience.
2.Owning independent logistic center.
3.Two factory in Hangzhou, one trading company.
4.Raw material advantage for the competitive price.
Please do not hesitate to contact us!!Waiting for your inquiry!!
FAQ
Q: I want to build a warehouse, what details should I supply?
A: 1.Floor area (length, width and height)
2.Span of steel structure (single span, double span, several span)
3.Whether there is a crane (crane tonnage)
4.Building height (along the height)
5.With or without envelope (open type, closed type)
Q: How much snow can carry?
A: According to the local climate conditions, the design is 0.5kN /m2 in the area with large snow volume.
Q: What is your delivery time?
A: According to the order to determine the time, usually 20-25 days.
Q: How to choose the window of the warehouse?
A: According to the design requirements of the workshop, there are bar Windows, with Windows, large Windows.Material has: model steel window, aluminium alloy window.
Other question please feel free contact our 24 hours on-line services, waiting for your message!