High Productivity Welded Wire Mesh Machine / Production Line For Roll Mesh
Product description:
1. It has advantages such as reasonable design, easy operation, low noise, high stability, low cost, high productivity, firm welding points, welding uniformity and good surface.
2. When the mesh is welding, the rolling mesh machine is also working to roll mesh together. You can put the mesh length number into control cabinet.
3. The hole size is adjustable and precise and the mesh width and length can be adjustable according to customer’s requirements on the control cabinet.
4. The machine can straighten and send cross wire automatically, weld mesh automatically, cut edge automatically, roll mesh automatically.while welding mesh working,the rolling mesh also work together.
Technical Parameter
Model | DHWJ-1 | DHWJ-2 | DHWJ-3 |
Wire diameter | 0.5-0.8mm | 0.8-1.8mm | 0.8-2.5mm |
Mesh size | 1/4"-1/2" | 1/4"-1/2" | 1"-6" |
Mesh width | 3feet,4feet | 4feet,5feet | 5feet,6feet,7feet |
Motor | 2.2kw,1.5kw | 2.2kw,1.5kw | 2.2kw,4.0kw |
Welding speed | max 75rows/min | max 120rows/min | max 80rows/min |
Overall dimension | 2.3*1.3*1.4m |
2.0*1.50*1.6m 3.0*1.75*1.6m |
2.0*1.50*1.6m 3.0*1.75*1.6m |
Weight | 1.5T | 2T,2.5T | 2T,2.5T,3T,3.5T |
Transformers | 50kva*3 | 65kva*4;65kva*5 | 65kva*4;65kva*5 |
after sales services:
1.Maintenance period:one year
2.If the buyers need, we can send our technical staff to the buyers’ place to debug the machine and providing the training in 30 days after the machines arrive at the destination port.
3.The commissioning fees: free
4.The training fees: USD100/day for each technical
5.The numbers of technical persons: one technical person per machines at most
6.The fees ,such as round-trip tickets, accomodation etc, are all in buyers’ account. During the maintenance period: the parts damaged non-artificially will be provided free of charge. If you need the technicians, we will assign the expertised staff to your company. And the fees,such as round-trip tickets, accomodation etc, are all in your account. After the maintenance period: If you need the machine parts, we will provide it as our cost. If you need the technicians, we will assign the expertised staff to your company. And the fees, such as round-trip tickets, accomodation etc, are all in your account.
packing details:
1. The main machine and auxiliary equipments will be with plastic package, spare parts in carton box.
2. The main machine will be fixed in the container by steel wire rope to make it stable.