Machined High Purity Tzm Titanium Molybdenum Zirconium Bars
Description:
ASTM B386 TZM Rod has excellent high temperature stability and can maintain high strength and hardness at high temperatures.
Specifications:
MECHANICAL COMPOSITION OF TZM ROD
Application:
Alloy composition control: When preparing TZM alloy rods, precise control of the ratio of elements such as molybdenum (Mo), titanium (Ti) and zirconium (Zr) is crucial to the final material properties. Changes in alloy composition will directly affect the high-temperature strength, corrosion resistance, thermal fatigue resistance and other properties of TZM alloy rods.
Sintering process: The sintering process of TZM alloy rods has an important impact on the density, grain size and organizational structure of the material. Appropriate sintering temperature and time can achieve densification of the alloy and promote the growth and directional arrangement of grains, thereby improving the strength and mechanical properties of the material.
Heat treatment process: Through different heat treatment processes, such as annealing, solution treatment and aging treatment, the structure and properties of TZM alloy rods can be further adjusted. Proper heat treatment can eliminate internal stress, improve the toughness and plasticity of the material, and optimize the grain structure, thereby improving the high-temperature stability and durability of the material.
Processing technology: The processing technology also has an important impact on the ultimate performance of TZM alloy rods. For example, through forging, drawing, spinning and other processing methods, the mechanical properties of the material can be improved, and the uniformity and density of the material can be improved, thereby enhancing the strength and reliability of TZM alloy rods.
FAQ:
Q : How can you control your quality?
A : For each production processing, ZhenAn have complete QC system for the chemical composition and Physical properties. After production, all the goods will be tested, and the quality certificate will be shipped along with goods.
Q: Are you a manufacture or trader?
A: Both, we not only can provide the high quality products with the best price, but also can offer the best pre-sale service and after-service.
Q : Do you provide free samples?
A : Of course, free samples are available.
Q: What is your lead time?
A : It usually needs about 15- 20 days after receiving the PO.