Description:
Silicon carbide is an inorganic substance with the chemical formula SiC. It is made of raw materials such as quartz sand, petroleum coke (or coal coke), sawdust (salt is needed to produce green silicon carbide) through high-temperature smelting in a resistance furnace. In nature, there are also rare silicon carbide minerals called moissanite. In industry, silicon carbide is divided into black silicon carbide and green silicon carbide, both of which are hexagonal crystals with a specific gravity of 3.20-3.25 and a microhardness of 2840-3320kg/mm2.
Silicon carbide is a compound material composed of silicon (Si) and carbon (C) with extremely high melting point and hardness. Silicon carbide has excellent electrical, thermal, mechanical and chemical properties and is widely used in high-power electronics, optoelectronics, automotive electronics, aerospace electronics and other fields.
Specifications:
Black Silicon Carbide powder Content for Concretion Grinder | ||||
Brand | Grit Size | Chemical Composition(%) | ||
SIC(min) | F.C(max) | Fe2O3(max) | ||
Black silicon carbide | F12-F90 | 98.5 | 0.20 | 0.60 |
F100-F150 | 98.5 | 0.30 | 0.80 | |
F180-F220 | 97.0 | 0.30 | 1.20 | |
Black Silicon Carbide powder Content for Coating Grinder | ||||
Brand | Grit Size | Chemical Composition(%) | ||
SIC(min) | F.C(max) | Fe2O3(max) | ||
C-P | P12-P100 | 98.0 | 0.25 | 0.70 |
P120-P150 | 97.5 | 0.35 | 0.90 | |
P180-P220 | 96.0 | 0.35 | 1.35 |
Packing & Delivery
Packing: 1 ton big bag, 20-25mt in 20' container
FAQ:
Q : How can you control your quality?
A : For each production processing, ZhenAn have complete QC system for the chemical composition and Physical properties. After production, all the goods will be tested, and the quality certificate will be shipped along with goods.
Q: Are you a manufacture or trader?
A: Both, we not only can provide the high quality products with the best price, but also can offer the best pre-sale service and after-service.
Q : Do you provide free samples?
A : Of course, free samples are available.
Q: What is your lead time?
A : It usually needs about 15- 20 days after receiving the PO.