Trade Wars and Geopolitical Tensions
Global trade wars or geopolitical tensions can disrupt the import and export of molybdenum ore. This disruption often leads to market uncertainty, which can negatively affect the price of molybdenum bars.
Technological Advancements and Substitutes
With advances in technology and the development of alternative materials, the demand for molybdenum bars may decrease. The availability of substitutes reduces the reliance on molybdenum, which can lead to lower prices.
Products | Molybdehum rods, bars |
Name of material | Molybdenum ( Pure): Mo>=99.95% TZM: 0.5% Ti / 0.08% Zr / 0.01-0.04 C Molybdenum lanthanum alloy: 0.3% - 0.6% La2O3 |
Density at 20 degree | >=10.18g/cm3 |
Size | Dia: 2.5-120mm |
Surface | Black, Cleaned, Machined, Polished, ground. |
Application | Glass melting electrodes, injection molding, in the field of device and machining technology or in the lighting industry |
In the process of product transportation, storage, sales and other circulation, in order to protect the product, convenient storage to promote sales, according to certain technical methods and the use of containers, materials and auxiliary objects attached to the decoration of the product. Product packaging is not only beneficial to ensure the safety and quality of special products, but also to protect the legitimate rights and interests of the storers, transporters, sellers and consumers.
Our company uses high quality, in accordance with the domestic packaging supervision of the shipping method, can also be customized according to your needs.
1: We have 6 ex-factory inspection procedures.
2: For each batch of products, 22 people participate in thequality inspection during the whole process of material, size, surface treatment, packaging, etc.
3: Ensurethat the factory products are 100% qualified.
Q: What's your warranty?
A.Mill test certificate;shipping inspection or any third party (for example: ) inspection in your site.
Q: Can you offer free samples?
A: We will return the sample fee once getting the mass production order.
Q: What is the delivery time?
A: Fast delivery in 5 days, up to order quantity.
Q: What are your terms of payment?
A: 30% T/T in advance, balance before loading, or LC at sight.
Q: Do you provide custom-made Products service?
A: Yes, custom-made is acceptable.