IEC62217 Insulator Multi Stress Testing Machine Rubber Test Equipment Lab Tester
1. Test sample: Two test insulators of the same design with a creepage distance between 500mm and 800mm,
2. Procedure: Conduct the test in a sealed, damp, and corrosion-resistant test chamber, with a volume not exceeding 20M3. Figure B1 is a schematic diagram of this test chamber
3. Separate observation holes for wipers and movable ultraviolet filters to observe the equipment in the experiment.
4. Test conditions: As shown in Figure B2, various stress cycles are applied to the insulator, which are repeated for about 5000 hours. During the equipment cycle test, the test sample should be subjected to temperature changes and condensation.
5. As shown in Figure B3, the test is installed vertically in the middle of the test, with a minimum distance of 400mm between the adjacent umbrella edges of the test specimen and the top, as well as between the test specimen and the wall and ground
Before the experiment begins, the test sample should be cleaned with deionized water,
7. Up to three pairs of samples with similar creepage distances can be tested simultaneously
8. Voltage: The value obtained by dividing the creepage distance of the test sample (in mm) by 34.6 (equivalent to a creepage distance of 20mm/KV, calculated based on the phase to phase voltage)
9. For the power circuit, when the continuous negative current load is 250mA (r.m.s), the maximum voltage drop on the high voltage side during 1 second should not exceed 5%, and the protection level should be adjusted to 1A (r.m.s)
10. Sunlight simulation: The simulated solar radiation is provided by a xenon arc lamp with a nominal output of 6500W and equipped with two borosilicate glass filters (see example B.4), with a distance of approximately 480mm between the xenon arc lamp and the test sample
11. At the beginning of each experiment, a new lamp and filter should be used. During the experiment, when replacing the filter (and if the lamp is also necessary), it should be done according to the recommendation of the lamp manufacturer
12. Artificial rain: Artificial rain is provided by nozzles installed on the upper part of the test specimen and on its periphery (see Figure B.3). The average rainfall rate is determined according to GB/T16927.1, and water with a maximum conductivity of 85 Ω m should be used. Each sample should be sprayed separately.
13. Dry heat: Heat the test room to 50 ℃± 2 ℃, and the time to reach this temperature should not exceed 15 minutes. Note: It is recommended to use a test room with walls that can be heated and insulated
14. Damp heat: Rated relative temperature: RH=95% ± 3%, at 50 ℃
15. Pollution: Spray salt spray (salt density: 7kg/m3 ± 5%) from the nozzle specified in GB/T4585 to simulate pollution, and spray each test sample separately
16. Salt spray calibration: Long rod-shaped ceramic insulator (hydrophilic material), normal umbrella shape, creepage factor=2.2 * (1 ± 10%)
FAQ |
Q:Are you factory or trading company?
A:We are factory in Dongguan City, Guangdong Province,China.Near Shenzhen or Guangzhou.
Q:What kind of certificate you have?
A:ISO9001 Certification, CE Certification.
Q:What is the lead time of the product?
A: Generally 7-15 days after getting the deposit.
Q:How about the payment term?
A: T/T, by cash, western union, or L/C.
Q:How about the warranty term?
A:1 year warranty,The engineer can teach the machine on the spot.
Welcome to visit our factory for sightseeing!
Supplier Company Name | Daxian Instrument Equipment CO.,Limited |
Company Address | Changlian Industrial Building, 168 Zhenan West Road, Xiabian Community, Chang'an Town, Dongguan, Guang Dong, China |
Contact Person | Sophia Su |
Mobile Number | 86-13266221899 |
Telephone Number | 86-0769-82759287 |