The equipment is mainly used for: IEC61215, IEC61646 ultraviolet pretreatment test and various test requirements of bypass diode.
Keyword:
Photovoltaic Modules
IEC61215 Standards Testing
IEC61215 Solar Panel Hail Impigement Testing Machine
The UV aging tester of photovoltaic modules simulates the damage caused by the ultraviolet rays in the sunlight when the module is exposed to the outdoors for a long time, and this equipment only needs a few days or weeks to reproduce the anti-UV aging performance of the module-related materials that take months or years outdoors.
Technical Specifications:
1. Materials used: high-quality materials that can block ultraviolet rays, have good sealing and heat preservation
2. The total UV irradiation area of the equipment: greater than 2000mm×2000mm, to meet the simultaneous test of 2 2m×1m components (can be made according to customer requirements)
3. Light source life: The system adopts metal halide lamp, and the lamp life is about 1000 hours.
4. Relative energy ratio of UVA and UVB per lamp: UVB accounts for about 3%~10% of the total energy
5. Irradiation intensity: The irradiation intensity with a wavelength of 280nm~385nm can reach about 100W/m² to ensure that the test cycle is shortened as much as possible
6. Irradiation uniformity: better than ±15%
7. Real-time monitoring and display of UVA and UVB intensity
8. One UVA (320nm~385nm) and one UVB (280nm~320nm) fiber probe
9. Module surface temperature: 60°C±5°C
10. Temperature resolution: 0.1°C
11. Ozone: almost no ozone is produced
12. Lighting method: light on the up, and the component test plane is perpendicular to the light source
13. Touch screen control and real-time monitoring, and automatically cut off the light source when the set value is reached
14. Real-time graphical display of component surface temperature, measurement accuracy ± 0.1°C.
A:We are factory in Dongguan City, Guangdong Province,China.Near Shenzhen or Guangzhou.Q:Are you factory or trading company?
Q:What kind of certificate you have?
A:ISO9001 Certification, CE Certification.
Q:What is the lead time of the product?
A: Generally 7-15 days after getting the deposit.
Q:How about the payment term?
A: T/T, by cash, western union, or L/C.
Q:How about the warranty term?
A:1 year warranty,The engineer can teach the machine on the spot.
Supplier Company Name | Daxian Instrument Equipment CO.,Limited |
Company Address | Changlian Industrial Building, 168 Zhenan West Road, Xiabian Community, Chang'an Town, Dongguan, Guang Dong, China |
Contact Person | Sophia Su |
Mobile Number | 86-13266221899 |
Telephone Number | 86-0769-82759287 |