1.Main technical parameters
1. Maximum printing length: 250mm
2. Printing width: 180mm
3. Printing speed: 5-60m/min
4. Overprinting accuracy: < 0.15mm
5. Total installed power: 6Kw
6. Overall dimensions: (L × B × H) 1680 × seven hundred and eighty × one thousand two hundred and eighty
7. Weight: ≈ 618KG
2, Main structural functions and working principles
The structure of this machine includes discharge, corona discharge, traction, first color printing, second color printing, oven, slitting, and material collection. (As shown in the figure)
2.Ink supply mechanism
1. Lift the ink bucket. 2. Anilox. 3. Scraper. 4. Printing roller. 5. Backrest roller composition.
(As shown in the figure)
3.Chromatic mechanism
Color matching is composed of a planetary gearbox transmission mechanism, which adjusts the planetary gearbox transmission left and right to align the pattern up and down. Adjust the printing rollers left and right to align the pattern up and down. (As shown in the figure)
5.Oven mechanism
When the printed matter passes through the oven, the heat emitted by the heating tube is blown out by a fan to dry the ink on the surface of the printed matter. The temperature of the oven is controlled by an intelligent temperature control meter and thermocouple induction.
6, Winding device
The winding device is mainly used for winding products into drums. He mainly has a reel. The power is driven by a motor to drive a gear, and the sprocket drives the power to rotate the winding shaft to achieve the purpose of winding. The tightness of the drum depends on the adjustment of the nut and spring.
7, Machine maintenance and upkeep
In order for the printing function to work normally for a long time and produce good printed products, the machine must be maintained and maintained well. Operators must undergo pre job technical training, not only familiarizing themselves with the flexographic printing process, but also understanding and mastering the structure, working principle, and normal operating methods of this machine. To master the key points of adjusting various institutions. Before starting the machine, it is necessary to comprehensively inspect the condition, operability, and flexibility of each part of the machine. Lubricating grease must be added to each lubricating part. During the operation of the machine, the police should inspect each operating component. If there are abnormal conditions such as bearing noise and vibration, the machine should be immediately stopped for inspection. Only after solving the problem can the machine be started. After stopping the machine, it is necessary to immediately turn off the power, clean the machine, remove the ink hopper, release the glue roller, exit the ink knife, and use cleaning agent to wipe the plate roller and ink blade, and inject oil at each lubrication point.
8, Electrical control system
This machine adopts two 220V/50Hz AC power supplies. The control system adopts 220V AC power. Please refer to the machine operation panel for specific electrical switches and instruments. After the installation of this machine is completed, start the main motor, adjust the speed, make the main machine rotate slowly, and check the direction of the main machine rotation.