High Efficiency Rotary Kiln for Chemical Metallurgy, Cement, Environment Protecting and etc
Application
It is used for calcining high-grade cement in cement plant, and also widely used in metallurgy, chemical industry, construction and other industries.
Product advantages
1. The structure of rotary kiln is simple
2. The production process control is convenient and reliable
3. Less vulnerable parts
4. High operation rate
Features
It has the advantages of simple structure, convenient and reliable production process control, less wearing parts and high operation rate.
Operation Principle
Rotary dryer is a material heating and drying device. The material in the coaxial sleeve rotary cylinder is dried by the spiral blade and intermittent spiral lifting plate in the process of turning back and lifting between the inner and outer cylinders.
Parameter
Model | Straight Through Dry Process | Dry Process | Hot End Expanded Dry Process Production | Dry Process | Dry Process of Decomposition Outside Kiln | Dry Process |
Specifications | Φ1.9/Φ1.6*36 | Φ2.4*40 | Φ2.4/Φ2*40 | Φ2.8/Φ2.4*50 | Φ3*48 | Φ3.5*70 |
Slope | 4% | 4% | 3.50% | 4% | 3.50% | 4% |
Speed (r/p.m) | 2.5~3 | 6~7 | 4.5~5.5 | 7.5~8.5 | 29.2 | 20~22 |
Output(t/h) | 0.53~1.59 | 0.173~1.73 | 0.42~1.25 | 0.11~1.07 | 0.57~3.41 | 0.5~1.27 |
Number of supports | 3 | 3 | 3 | 3 | 3 | 4 |
Motor model | JZT2-72-4 | JZS2-8-2 | JZT382-4 | JZS2-9-2 | JZS2-10-2 | JR126-6 |
Motor power(kw) | 30 | 4~40 | 4~40 | 6~60 | 16.7~100 | 155 |
Speed range (r/p.m) | 400~1200 | 160~1200 | 400~1200 | 120~1200 | 200~1200 | 350~980 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.