Factory Price Mining Machine Lifting Agitation Tank for Gold Dressing Plant
Introduction
The impeller of agitation tank is driven by the motor and motor v-belt or gear motor, making the solid particles to suspend and making agent and ore pulp mixed adequately. It has four functions: ore pulp agitation, agitation storage tank, improving agitation and agent agitation. Agitation tank is suitable for ore dressing industry and can also be used in agitation of pulps from other industries.
Features
The impeller rotating in the tank is similar to the function of centrifugal pump. It uses its suction to absorb the material pump from the feed pipe to the cavity of impeller and then fling the pulp out along the centrifugal directions around the impeller. The slurry which was flung out fills the tank and makes the solid phase to suspend, thus achieving lifting effect of agitation. When the altitude difference is inadequate or relative less for pumping due to the configuration of equipment, lifting agitation tank can be adopted.
Main applications:
Suitable for agitating and lifting of slurry in dressing plants of ferrous and non-ferrous metals and other departments.
Parameter
Models | Effective volume | Diameter of tank | Rotating speed | Driving motor | Lifting height | Weight | |
Models | Power | ||||||
m³ | mm | r/min | kw | m | t | ||
XBT-Ф1000×1500 | 1 | 1000 | 502 | Y132S-4 | 5.5 | 1.0 | 0.99 |
XBT-Ф1500×1800 | 3 | 1500 | 400 | Y132M-4 | 7.5 | 1.2 | 1.62 |
XBT-Ф2000×2000 | 6 | 2000 | 363 | Y180L-6 | 15 | 1.5 | 2.26 |
XBT-Ф2500×2500O | 12 | 2500 | 363 | Y200L2-6 | 22 | 1.5 | 4.27 |
XBT-Ф3000×3000 | 19.1 | 3000 | 363 | Y225M-6 | 30 | 1.5 | 6.1 |
Workshop
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.