Mineral Machinery Nzt High-Efficiency Concentrator for Mining Dressing Plant
Introduction
Concentrator is generally used for concentrate concentration and dehydration of tailings before filtration in dress plants to concentrate the ore pulp with concentration of 20-30% to concentration of 40-70%. It is widely used for concentration and purification of slurry containing solid materials in industries of ore dressing, metallurgy, chemical industry, coal, construction materials, and source water and wastewater treatment, etc.
Features
Thickener promoted the structure of internal feed tube on the basis of traditional vertical flow sedimentation tank, which greatly increase settling efficiency. The tank is circular, suspended solids settle down into bottom conical sludge tank by gravity, clear water flow away from overflow port around the upper tank. The overflow port is equipped with scum filter and baffle to ensure the water quality.Thickener is applicable to the concentrate and tailings dehydration processing in beneficiation plant, widely used in metallurgical, chemical, coal, nonmetal ore dressing, environment protection, etc.
Parameter
Models | Diameter of concentration tank | Depth at the tank center | Sediment area | Time/revolution for rake | Transmission power | Rake-lifting power | Height of rake-lifting |
m | m | m2 | min/r | kw | kw | mm | |
NZT-38 | 38 | 4.5 ~ 7 | 1134 | 10-25 | 11 | 4 | 600 |
NZT-45 | 45 | 5 ~ 7.5 | 1590 | 12-26 | 15 | 4 | 600 |
NZT-53 | 53 | 5 ~ 8 | 2206 | 15-30 | 15 | 5.5 | 700 |
NZT-65 | 65 | 5.5 ~ 8.5 | 3318 | 15-35 | 18.2 | 5.5 | 800 |
NZT-75 | 75 | 6 ~ 9 | 4417 | 20-40 | 22 | 7.5 | 800 |
NZT-80 | 80 | 6.5 ~ 10 | 5026 | 20-50 | 30 | 7.5 | 900 |
NZT-100 | 100 | 7 ~ 11 | 7854 | 25-80 | 37 | 11 | 1000 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.