Mining Common Mixing Agitation Tank Concentrator
Introduction
Flotation machine refers to the mechanical equipment that completes the flotation process. In the flotation machine, the agent is added to the slurry, the slurry is stirred and aerated, and some of the ore particles are selectively fixed on the bubbles; they float to the surface of the slurry and are scraped out to form a foam product, and the rest is left in the slurry In order to achieve the purpose of separating minerals.
Features
It is composed of driving device, downward swept agitating impeller, arc complex surface, guiding device and cell body parts.
The rotation of downward swept agitating impeller makes the ore pulp circulate in "w" type under the function of guiding device of arc complex surface set at the bottom of the cell. The flow regime is mainly in axial direction, agitation strength is strong, there is no dead angle within the cell and pulp is agitated uniformly.
Parameter
Specifications | Effective area | Diameter of impeller | Revolution of impeller | Driving motor | Weight | |
Models | Power | |||||
m³ | mm | r/min | kw | kg | ||
CK1000*1000 | 0.58 | 240 | 530 | Y132M1-6 | 4 | 603 |
CK1250*1250 | 1.4 | 240 | 350 | Y132M2-6 | 5.5 | 1218 |
CK1500*1500 | 2.2 | 420 | 320 | Y160M-6 | 7.5 | 2428 |
CK2000*2000 | 5.46 | 560 | 240 | Y180L-8 | 11 | 3420 |
CK2500*2500 | 11.2 | 560 | 232 | Y225M-8 | 22 | 4332 |
CK3000*3000 | 19.1 | 700 | 220 | Y250M-8 | 30 | 6952 |
CK4000*4000 | 45 | 1000 | 153 | Y280S-8 | 37 | 10516 |
CK5000*5000 | 78.5 | 1250 | 120 | Y280M-8 | 45 | 12620 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.