High-efficiency Agitation Tank Mining Mixer Pulp Mixing Barrel for Gold Processing Plant
Introduction
The mixing barrel is suitable for various metal mines, and the anti-corrosion agent mixing tank is used for mixing and mixing the agent in the slurry.
Features
It is composed of driving device, downward swept agitating impeller, arc complex surface, guiding device and cell body parts.
The rotation of downward swept agitating impeller makes the ore pulp circulate in "w" type under the function of guiding device of arc complex surface set at the bottom of the cell. The flow regime is mainly in axial direction, agitation strength is strong, there is no dead angle within the cell and pulp is agitated uniformly.
1. The impeller has a large diameter and strong mixing capacity for ore pulp and medicine.
2. The impeller has high linear speed and strong mixing capacity of ore pulp and medicine.
3. The downward-swept impeller enhances the mixing capacity of the slurry and medicine.
Parameter
Specifications | Effective area | Diameter of impeller | Revolution of impeller | Driving motor | Weight | |
Models | Power | |||||
m³ | mm | r/min | kw | kg | ||
CK1000*1000 | 0.58 | 240 | 530 | Y132M1-6 | 4 | 603 |
CK1250*1250 | 1.4 | 240 | 350 | Y132M2-6 | 5.5 | 1218 |
CK1500*1500 | 2.2 | 420 | 320 | Y160M-6 | 7.5 | 2428 |
CK2000*2000 | 5.46 | 560 | 240 | Y180L-8 | 11 | 3420 |
CK2500*2500 | 11.2 | 560 | 232 | Y225M-8 | 22 | 4332 |
CK3000*3000 | 19.1 | 700 | 220 | Y250M-8 | 30 | 6952 |
CK4000*4000 | 45 | 1000 | 153 | Y280S-8 | 37 | 10516 |
CK5000*5000 | 78.5 | 1250 | 120 | Y280M-8 | 45 | 12620 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.