Introduction
Stirring pumping is the abbreviation of mechanical agitating leaching tank, which is divided into single paddle stirring and multi paddle stirring. The tank body is cylindrical, and the bottom of the tank is spherical or flat. There is a circulation cylinder in the center, and the agitator is installed in the lower part of the circulation cylinder. The tank is usually made of carbon steel lined with acid-resistant bricks. The agitator has the form of paddle, propeller, anchor and pulley. The most commonly used propeller agitator impeller is generally made of carbon steel lined rubber. The diameter of the propeller agitator is usually taken as 0.25 to 0.35 of the tank diameter.
Parameter
Specifications | Effective area | Diameter of impeller | Revolution of impeller | Driving motor | Weight | |
Models | Power | |||||
m³ | mm | r/min | kw | kg | ||
CK1000*1000 | 0.58 | 240 | 530 | Y132M1-6 | 4 | 603 |
CK1250*1250 | 1.4 | 240 | 350 | Y132M2-6 | 5.5 | 1218 |
CK1500*1500 | 2.2 | 420 | 320 | Y160M-6 | 7.5 | 2428 |
CK2000*2000 | 5.46 | 560 | 240 | Y180L-8 | 11 | 3420 |
CK2500*2500 | 11.2 | 560 | 232 | Y225M-8 | 22 | 4332 |
CK3000*3000 | 19.1 | 700 | 220 | Y250M-8 | 30 | 6952 |
CK4000*4000 | 45 | 1000 | 153 | Y280S-8 | 37 | 10516 |
CK5000*5000 | 78.5 | 1250 | 120 | Y280M-8 | 45 | 12620 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.