Gold Mining Processing Mine Thickener
Introduction
thickener is a center-drive thickener,which is a traditional thickening equipment with a history of earlier application. The thickener with a diameter less than 12m is of manual handle type, and thickeners with a diameter over 12m adopt electric handle devices. Large-scale thickener is usually arranged with a concrete tank, with overload indicating or alarming devices. This machine has the features like simple structure, low wearing and convenient maintenance.Models and specifications | 3ZNZS-5 | 3NZS-7.5 | 3NZS-9 | 3NZS-12 | 3NZS-15 | |
Inner diameter of concentration tank | 5 | 7.5 | 9 | 12 | 15 | |
Height of each layer | Upper layer | 2400 | 2400 | 2400 | 2400 | 2700 |
Middle layer | 2100 | 2100 | 2100 | 2100 | 2350 | |
Lower layer | 2300 | 2300 | 2300 | 2300 | 2750 | |
Sediment area (tank bottom) (m2) | 19.6 | 44.2 | 63.9 | - | - | |
Rotating speed of rake ( r/min) | 0.375 | 0.285 | 0.28 | 0.15 | 0.15 | |
Handling capacity (t/d) | 8-27 | 42-61 | 68-88 | - | - | |
Height of rake-lifting (mm) | 200 | 200 | 200 | - | - | |
Feed concentration (%) | 30-40 | 30-40 | 30-40 | 30 | 30 | |
Discharge concentration (%) | 40-50 | 40-50 | 40-50 | 55 | 55 | |
Feed particle size -% in 200 screens | 80-98 | 80-98 | 80-98 | 98 | 98 | |
Motor | Models | Y122M-6 | Y132S-6 | Y132M1-6 | - | Y132M2-6 |
Power (kw) | 2.2 | 3 | 4 | - | 960 | |
Rotating speed (r/min) | 940 | 960 | 950 | - | - | |
Models of reducer | Models | JZQ-350-V-4Z | JZQ-400V-4Z | JZQ-400-4Z | - | - |
Speed ratio | 20.49 | 20.49 | 20.49 | - | - | |
Weight (kg) | 9675 | 16066 | 21900 | - | - |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.