Mine Concentrator , Thickeners In Mineral Processing
Introduction
The thickener is a continuous concentration and clarification devices work, it is mainly used in the fine wet-processing operations, tailings slurry dewatering; also widely used in coal, iron and steel, chemicals, building materials, water and sewage treatment and other industries solids slurry is concentrated and purified. Concentrating mechanism conventional thickener is essentially a gravitational settling, it is based pulp free settling particles to achieve a layered particle sedimentation, and concentrated in the bottom region further compaction. Processing capacity and the overflow of the solids thickener depends mainly on the settling velocity of the particles.
Features
1.Small area taken, large capacity
2.Slender body, flocculants are added in the process of concentrate; Accelerate the particle
3.settlement and dewatering process.
4.Reasonable structure, low energy consumption, high efficiency and low operation and maintenance cost
Parameter
Models | Diameter of concentration tank | Depth at the tank center | Sediment area | Time/revolution for rake | Transmission power | Rake-lifting power | Height of rake-lifting |
m | m | m2 | min/r | kw | kw | mm | |
NZT-38 | 38 | 4.5 ~ 7 | 1134 | 10-25 | 11 | 4 | 600 |
NZT-45 | 45 | 5 ~ 7.5 | 1590 | 12-26 | 15 | 4 | 600 |
NZT-53 | 53 | 5 ~ 8 | 2206 | 15-30 | 15 | 5.5 | 700 |
NZT-65 | 65 | 5.5 ~ 8.5 | 3318 | 15-35 | 18.2 | 5.5 | 800 |
NZT-75 | 75 | 6 ~ 9 | 4417 | 20-40 | 22 | 7.5 | 800 |
NZT-80 | 80 | 6.5 ~ 10 | 5026 | 20-50 | 30 | 7.5 | 900 |
NZT-100 | 100 | 7 ~ 11 | 7854 | 25-80 | 37 | 11 | 1000 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.