Residential Concrete Floor Grinding Machine 2.2KW motor 1440rpm speed
HW-G1 not only grinds the floor, but also grinds the edge!
It is designed as a floor grinder with edge function on both sides. The machine is light and compact, for easy transportation and set-up. You needn’t to be professional for handle this machine. It is easy to use and maintain!
If you are focused on edging, floor edge grinder HW-G1 China-made machinery is the best bet in the business.
On a grinded or polished concrete project, dealing with the edge is one of the least desirable aspects of the process. HW-G1 floor edge grinder is the ideal solution for grinding and polish borders, edges, bathrooms and narrow area where normal floor grinding machine cannot work. If you do lots of edging work, the floor edge grinder HW-G1 is for you.
Parameters:
Model: | HW-G1 |
Voltage: | 220V 1phrase |
Power output: | 2.2KW,3hp |
Motor Brand: | China Wonder |
Frequency: | 50/60HZ |
Current: | 13A |
Grinding Width: | 280mm/11” |
Grinding Pressure: | 41KG/90.2lbs |
Additional Weight: | N / A |
Dust Port: | Φ 50mm |
Motor Speed: | 1400rmp |
NO.of Diamond Pad: | 6 pcs |
Machine L*W*H: | 1100*420*1000mm |
Net Weight: | 75KG/165lbs |
Advantages:
Grinding floor edge;
Grinding samll area;
For 220v,single phrase.
Quick change of diamond pad, no need for tools;
Very easy for transportation and set-up;
Ergonomic working posture;
Easy for machine maintenance;
Closer Look
Grinding plate and diamond tools of HW-G1
Grinding the floor edge
Company introduction
Changsha Honway Machinery Co., Ltd is the Professional manufacturer for floor scarifying & grinding & polishing machine in China. Our company is well equipped with CNC machine for mechanical treatment and gear hobbing machines for gear processing. We are proud of having a team of experienced technicians and workers. All of the products are CE certified and comply with international standard. The products are already exported to 20 countries and got the good reputation.
Production Flow
After sell Service
1. One year of warranty for machine.
2. In the warranty period, the spare parts are sent by DHL, which is paid by Honway Company.
3. Out of warranty period, the spare parts are sent by DHL, which is paid by customer.
4. Honway always store the spare parts of old models, in case that the machine needs repair in future.
5. All gear boxes are tested 48 hours before it leaves factory.
6. We could send the technologists to distributors, for training the after sell service staff and maintenance issues.