Full-automatic Continuouse Low Density Polyurethane Foam Machine Production Line
Product Description
Full-automatic Continuouse Polyurethane Foam Making Machine is the automatic horizontal continously foaming machine that make the furniture foam like sofa and mattress. The standard machine was together with 13 kinds of raw material.
For the process of foaming:
Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process
Auto Polyurethane Foam Machine Production Line 2500~6000r/min CE Certificate
Main specification
Max.Output Capacity | 200~350kg/min(Continuous Type) |
Mixer Total Power | 37kw |
Max.Mixing Speed | 2500~6000r/min |
Foaming Type | Trough & Sprayer |
Standard Material Q.T.Y. | 13 Groups. |
Foaming Size | W2300mm*H1300mm(Width Adjustable) |
Control System | PLC Digital Touch Screen |
PPG Tank | 5Ton*1Set. |
POP Tank | 5Ton*1Set. |
TDI Tank | 5Ton*1Set. |
MC Tank | 2Ton*1Set. |
Caco3 Tanks | 5Ton*1Set |
T-9/Amine/Color 1ABCD/ Silicone /Water Tanks | 180L*8Sets |
Side Wall Size | L16m*H1200mm |
Fall plate | L8.5m*W0.98~2.4m(Adjustable) |
Foaming Platform | L2000mm*W3000mm*H700mm |
Conveyor Line | L16.9m |
Side/Bottom Paper Feed & Rewind System | 2Sets. |
Walkway | W500mm*L15m |
Air Valves | U.S. Standard |
Chiller(Both Cooling & Heating System) | 1Set*1.5HP |
R.S.Pulling System | 1Set. |
Foaming Density Range | 8~150kg/Cubicmeter. |
Match With Block Cutter | 1Set. |
Total Motor Power | Approx 125kw. |
Machine N.W. | Approx 30 Ton |
Floor Space Required | L45m*W5m*H4.5m. |
FAQ:
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
The main part of the machine