Automatic Polyurethane Horizontal Foam Cutting Machine For Pillow Sponge
Product Description
[Equipment features]
This machine adopts the most advances frequency conversion control technology,it mainly used for horizontal slice cutting work of recycled foam and high density foam.The machine uses automatic digital control,it is easy to operate with precisely cutting,it can also add pressure roller.
[Specifications]
Model | ZHQG-1650 | ZHQG-2150 |
Cutting foam size | L2000×W1650×H1200mm | L3000×W2150×H1200mm |
Cutting thickness | 3~80mm | 3~80mm |
Cutting speed | 0~25m/min | 0~25m/min |
Blade length | 7700mm | 8700mm |
Total power | 8.12kw | |
Machine weight | 2000kg | 2200kg |
Machine external size | L5800×W3500×H2400mm | L7800×W4200×H2400mm |
Remark: The above only for reference. All the data is subjected to sold production.
worktable size | L2000*W1650/L3000*W2150 |
motor | sharp motor and movable motor |
Rated Power | 8.12KW |
The details:
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
We will try the best way to pack all the machine well and also save the freight cost.
Our Services
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1 engineer help to install the machine you must send someone to help about 2 days installation will finished and the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some pictures we will help to handle within 24hours.
You are warmly welcome come and visit our factory.