Specifications
Brand Name :
ZHMACH
Model Number :
ZHF-2018
Certification :
CE Certificate
Place of Origin :
Guangdong,China
MOQ :
one set
Price :
inquiry
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
1.5 set per month
Delivery Time :
shipped in 45-50 days after payment
Packaging Details :
Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
Name :
Low pressure foaming machine
Overall Dimension :
35m*4.55m*3.2m
Density :
8Kg/m³~100Kg/m³
Product Width :
1200mm~2300mm (adjutable)
Mixing head :
Siemens tranducer
Maximum Capacity :
200~300L/min
Motor types :
Guangdong
Raw Material :
PPG, TDI, MC, A33, T9, Silicone Oil, H2O, Pigment, Ect
Small material tank :
180L/δ1mm stainless steel
Filter tank :
1.5m³/δ4mmA3 steel plate
Description

Continuously Sponge Production Line , Automatic Foam Mattress Making Machine

Description:

Foam Sponge Making Machine Line is the automatic horizontal continously foaming machine that make the furniture foam like sofa and mattress. The standard machine was together with 13 kinds of raw material.

For the process of foaming:

Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process

Max.Output Capacity 200~350kg/min(Continuous Type)
Mixer Total Power 37kw
Max.Mixing Speed 2500~6000r/min
Foaming Type Trough & Sprayer
Standard Material Q.T.Y. 13 Groups.
Foaming Size W2300mm*H1300mm(Width Adjustable)
Control System PLC Digital Touch Screen
PPG Tank 5Ton*1Set.
POP Tank 5Ton*1Set.
TDI Tank 5Ton*1Set.
MC Tank 2Ton*1Set.
Caco3 Tanks 5Ton*1Set
T-9/Amine/Color 1ABCD/ Silicone /Water Tanks 180L*8Sets
Side Wall Size L16m*H1200mm
Fall plate L8.5m*W0.98~2.4m(Adjustable)
Foaming Platform L2000mm*W3000mm*H700mm
Conveyor Line L16.9m
Side/Bottom Paper Feed & Rewind System 2Sets.
Walkway W500mm*L15m
Air Valves U.S. Standard
Chiller(Both Cooling & Heating System) 1Set*1.5HP
R.S.Pulling System 1Set.
Foaming Density Range 8~150kg/Cubicmeter.
Match With Block Cutter 1Set.
Total Motor Power Approx 125kw.
Machine N.W. Approx 30 Ton
Floor Space Required L45m*W5m*H4.5m.
Packaging & Shipping

1. The Foam machine sponge making machine nacked packing and some spares parts we will pack in the wooden case also in order to save the place we will also put some parts into the material tanks.

2.Then we can save the cost of shippment and for one 13groups machine we need 2*40HQ+1*20GP three containers only

Our services:

1.We will help to design the layout of the machine that put in your factory.We will send 2-4 experience engineers to install and testing the machines.

2.We will teach your engineer how to operate the machine and how to maintain the machines.

3.We will give you the machine operation manual and the best formulation for target products that you are going to make.

4.We will help to buy the best raw material for making the foam if you needed.

Terms of Payment: 30% advance payment by T/T upon signing the contract

70% covered by T/T before delivery or sight confirmed L/C.

Installation and Start-up: 2 technicians will be assigned to coordinate installation,commissioning and

training, cost for flight and suitable accommodation plus USD50/day will be charged additionally.

Warranty: 12 months limited warranty. Starting from date of delivery excluding wear parts.

Shipping cost for parts to be replaced during warranty period have to be borne by the customer.

FAQ

Q: How many days for the install and testing of the machine?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

Q: For the cost of the engineer how much I need to pay?

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

Q:What kind of raw material tools we need to prepare for the testing?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

Continuously Sponge Production Line , Automatic Foam Mattress Making Machine

Continuously Sponge Production Line , Automatic Foam Mattress Making Machine

automatic foaming machine line.pdf

Send your message to this supplier
Send Now

Continuously Sponge Production Line , Automatic Foam Mattress Making Machine

Ask Latest Price
Watch Video
Brand Name :
ZHMACH
Model Number :
ZHF-2018
Certification :
CE Certificate
Place of Origin :
Guangdong,China
MOQ :
one set
Price :
inquiry
Contact Supplier
video
Continuously Sponge Production Line , Automatic Foam Mattress Making Machine
Continuously Sponge Production Line , Automatic Foam Mattress Making Machine

Dongguan Zehui machinery equipment co., ltd

Verified Supplier
9 Years
guangdong, dongguan
Since 2015
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
1500000-3000000
Employee Number :
20~50
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement