Automatic Continuous Multiple Hot Sponge Block Making Machine Line for Mattress
Product Description
This machine is mainly for continuous making sponge density 8-100kg/m³. It adopts high automatic level , More flexible operation touch screen control system , user can store 10 kinds of different formulations and adjust the formulation anytime , and remote control by Internet , which makes the control of cost more scientific and visual.
[Specifications]
TECHNICAL SPECIFICATIONS | |||
Model | ZHF-2017 | ||
Foaming group | 13 Groups | ||
Foaming type | Sprayer/Trough | ||
Foaming width | 1150~2250mm | ||
Foaming heigh | 1300mm | ||
Foaming density | 8-100kg/m³ | ||
Foaming speed | 2000-8000mm/min | ||
Max.output | 200L-350L/min | ||
Mixing head power | 37KW | ||
Total power | 130KW | ||
Oven length | 18000mm | ||
Machine external size | L35000*W4500*H4200mm |
(1)The whole machine parts specifications:
1.Foaming control Platform(standard) L3m×W2.52m×H0.7m
2.Oven declining board (standard) L9m×W0.98m~2.30m
3.Oven side links(standard) L18m×W2.3m×H1.2m
4.Oven machine frame(standard) L18m ×W4m×H3m
5.Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
6.Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )
Motor | Guangdong brand |
Pump | Viking pump & Chinese pump |
Invertor | Siemens brand |
PLC | Siemens |
Temperature | Control system |
Type | Use | Specification | Qty |
Big material tank | PPG | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | POP | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1
|
Big material tank | CaCo3 | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | TDI | 5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system | 1
|
Big material tank | Flame retardant | 2m³/δ3m stainless steel, with filter system | 1 |
Big material tank | MC | 2m³/δ2mm stainless steel, with filter system | 1 |
Small material tank | Si | 180L/δ1mm stainless steel | 1 |
Small material tank | A-33 | 180L/δ1mm stainless steel, with filter system | 1 |
Small material tank | T9 | 180L/δ1mm stainless steel, with filter system | 1 |
Small material tank | H2O | 180L/δ1mm stainless steel | 1 |
Small material tank | Color | 180L/δ1mm stainless | 1 |
Small material tank | Anti-yellow | 180L/δ1mm stainless steel | 1 |
Small material tank | Black | 180L/δ1mm stainless steel | 1 |
Floor powder mixing tank | PPG, POP, Powder | 1.5m³/δ3mmA3 steel plate, with filter system | 1 |
Filter tank | POP, Powder | 1.5m³/δ4mmA3 steel plate | 1 |
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
How many container will be needed for the whole set of machine?
Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
We will try the best way to pack all the machine well and also save the freight cost.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
You are warmly welcome come and visit our factory.