Quick Detail of PU Foam Making Machine
ZHQG-YM03 Discharge pressure sponge machine
1,Pressure sponge size: 1250mm
2,Pressure thickness:0-200mm
3,Pressure foaming speed:0-60m/min(Frequency converter timing)
4,The diameter of the upper pressure roller:400mm.There are six groups of upper pressure rollers. Each pressure roller group consists of 11 pressure rollers forming a wheel sheet, evenly distributed. These two groups are staggered at intervals of 36
5. The lower press rollers are 260 mm in diameter, in six groups. The spacing is equal to that of the upper rollers and is opposite to the upper rollers. The rollers are equipped with a sponge conveyor belt, specification: W1250 * 4498mm (ring belt)
6,Outfeed conveyor frame: W1250 *L360mm
7,Exterior dimensions of machine:Ll2500 * W1960 * H1400mm
8,Total power:7.5KW
Main collocates and material chooses:
Material pot types: (The work pressure in the pot is normal pressure)
Type | Use |
Specification |
Qty |
Big material tank | PPG+mixture material | 3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | TDI | 2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system |
1 |
Big material tank | MC |
1m³/δ2mm stainless steel |
1 |
Small material tank | Si,T9,A33,Color | 80L/δ1mm stainless steel | 4 |
Transducer Types
Model | Power/kw |
Use |
Qty | Brand |
VFD-B | 11 |
Mixing head |
1 | Delta |
VFD-B | 5.5 |
PPG |
1 | Delta |
VFD-B | 3.7 |
TDI |
1 | Delta |
VFD-B | 2.2 |
MC |
1 | Delta |
VFD-B | 1.5 | Si,T9,A33,Color |
4 |
Delta |
Motor types:
Model | Power/kw |
Use |
Qty | Brand |
Y200L-2 | 11 |
Mixing head |
1 | Guangdong |
Y132S-4 Horizontal | 7.5 |
PPG |
1 | Guangdong |
Y132S-4 Horizontal | 3.7 |
TDI |
1 | Guangdong |
Y100-4 Horizontal | 2.2 |
MC |
1 | Guangdong |
Y100-6 Horizontal | 1.5 |
Ann, Si, Tin, Color, |
4 | Guangdong |
Y100-4 Vertical | 2.2 |
PPG material mixing |
1 | Guangdong |
Y100-4 Vertical | 1.5 |
TDI Mixing |
1 | Guangdong |
Y100-4 Horizontal | 2.2 |
PPG mixing |
1 | Guangdong |
Y100-4 Horizontal | 2.2 |
TDI filing |
1 | Guangdong |
Our Services
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.