45 Meters Long Continuous Foam Making Machine For Flexible Polyurethane Foam
The ZHF-2017 Horizontal Continuously foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.
We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.
1. We will make all the machine parts and install it in our factory after the customer come and check the machine then we arrange the loading.
2. We will send 2-4 engineers to the customer factory to help to install and testing the machine. We will send the opeartion manul and teach the engineer in customer factory how to use the machine.
3. We will offer one year warranty period and after that we will offer long time after sale service.
Main technique specification:
Dimension | Total length 35m×Total width 4m×Total Height 3m |
Foaming material Group | 13 groups, man-machine interface, both manual and automatically computer control |
Foaming width | 980mm~2250mm |
Foaming height | Max 1200mm |
Foaming density | 8Kg/m³~100kg/m³ |
Foaming speed | 2000r/min~7000r/min |
Max total output | 300kg/min |
Material spraying way | ① The way of down sprayer head (upper, down, front, back can be adjusted) ② the way of trough overflow pipe. |
Controlling way of foaming | ①PLC controlling, can continuously foaming two different formulas in one time ②All inverter controlling foaming and work in phase with the production line ③Oven declining board height and width can be adjusted by control box. ④Oven side links width can be adjusted by control box |
Mixing –head motor | 37kw |
Total power | About 90kw |
Type | Use | Specification | Qty |
Big material tank | PPG | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | POP | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1
|
Big material tank | CaCo3 | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | TDI | 5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system | 1
|
Big material tank | Flame retardant | 2m³/δ3m stainless steel, with filter system | 1 |
Big material tank | MC | 2m³/δ2mm stainless steel, with filter system | 1 |
Small material tank | Si | 180L/δ1mm stainless steel | 1 |
Small material tank | A-33 | 180L/δ1mm stainless steel, with filter system | 1 |
Small material tank | T9 | 180L/δ1mm stainless steel, with filter system | 1 |
Small material tank | H2O | 180L/δ1mm stainless steel | 1 |
Small material tank | Color | 180L/δ1mm stainless | 1 |
Small material tank | Anti-yellow | 180L/δ1mm stainless steel | 1 |
Small material tank | Black | 180L/δ1mm stainless steel | 1 |
Floor powder mixing tank | PPG, POP, Powder | 1.5m³/δ3mmA3 steel plate, with filter system | 1 |
Filter tank | POP, Powder | 1.5m³/δ4mmA3 steel plate | 1 |
FAQ:
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
The main part of the machine