Vertical Polyurethane Memory Foam Cutting Machine Adjustable Speed Manual
Product Description
[Equipment features]
This machine is mainly used for vertical cutting of large pieces of foam,it is suitable for the manufacture of foam furniture. while it can process all kinds of EVA, EPE, packing materials and paper etc. It uses aluminum work table with linear sideway to guide board movement,it can position more accurately with better cutting nad Easy to operate of manually.
[Specifications]
Machine external size L4500×W4000×H2550mm L4500×W4800×H2550mm
Remark: only for reference. All the data is subjected to the sold production.
Model | QHLQ-4L (Middle) | QHLQ-4L (Big) |
---|---|---|
Inside worktable size | W1200×L2290mm | W1720×L2290mm |
Outside worktable size | W1320×L2290mm | W1200×L2290mm |
Cutting thickness | 3~mm | 3~mm |
Cutting height | H800/1200mm | H800/1200mm |
Blade length | 7320mm/8100mm | 8100mm/8900mm |
Total power | 1.5kw | 1.74kw |
Machine weight | 1300kg | 1500kg |
First, Computer-Aided Design (CAD) software is used to create and optimise a design based on the object the foam packaging is intended to hold. Once this design is finalised, Computer-Aided Manufacturing (CAM) software is used to turn the dimensions of the design into detailed numerical instructions for the CNC machine to understand. The file information must also be converted into a language that CNC machines understand. This language is called G-code.
The G-code essentially tells the machine what operations to perform, such as the dimensions and depth of a cut, as well as the toolpath to follow. Once the CNC machine has received the G-code and has been set up with the appropriate router bit and material, it is then time to cut the final product out of foam. Precise mechanisms and sharp blades enable the operator to cut any shape out of the foam, as long as the thickness corresponds to the thickness of the material.
Remark: The above only for reference. All the data is subjected to sold production.
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
We will try the best way to pack all the machine well and also save the freight cost.
Our Services
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
How to use this machine?
This is the manual operation you can just move the worktable by hand adjusted the size you need easy operation.
What is the advantage of your machine?
Baffle adopt dia30mm beeline rail
Worktable adopt T25mm Beeline rail and three T75 lift rail
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1 engineer help to install the machine you must send someone to help about 2 days installation will finished and the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some pictures we will help to handle within 24hours.
The details: