High Strength Garage Door Roll Forming Machine , Roller Shutter Door Making Machine Weight 2t
Product description
The deck floor panel can be used as the eternal form work of the cast-in-place concrete. And it can save the time and labor for install and demolish the form work. High strength, rigidity, construction of convenient .Easy to update, easy industrialized production.
Quick Detail
Suitable Material | Material | GI, PPGI, PPGL |
Thickness | 0.3-0.8mm | |
Yield strength | Q235 | |
Material of rollers | High grade 45# forged steel, surface hard chromium plating | |
Rows of rollers | 12rollers | |
Material of shafts | High grade 45# forged steel | |
Diameter of shafts | 50mm | |
Material of cutting blade | Cr12 Heat Treatment | |
Cutting Mode | Hydraulic Guide Column | |
Speed | 20-25m/min | |
Side plate thickness | 16 mm | |
Chain size | 1 inch | |
Total power | 4 kw | |
Voltage | 380V 50HZ 3Phase | |
Appearance size (About) | 5700mm*1000mm*1000mm | |
Weight(About) | 2tons | |
Length measurement | Encoder | |
Control mode | PLC | |
Operating mode | Button +Touch screen |
FAQ
1) Q: Do you have after sales support?
A: Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.
2) Q: How do your machines compare with other big companies in this market?
A: We are up to date with the latest technology and improve our machines accordingly
3) Q: Will you deliver the right goods as ordered? How can I trust you?
A: Yes, we will. The core of our company culture is honesty and credit. And we have got ISO/CE certifications.
4) Q: What can you do if the machine broken?
A: Our machine's warranty period is 24 months, if the broken parts can't repair we can send the new parts replace the broken parts free, but you need pay the express cost yourself if after warranty period
we can through negotiation for to solve the problems, and we supply the technical support for the whole life of the equipment.