4T/D fresh dried mango production / processing line
The nutritional value of mango;
Mango is one of the famous tropical fruits. Mango fruit contains sugar, protein and crude fiber. Mango contains a high content of vitamin A, which is rare in all fruits. Secondly, the vitamin C content is not low. Minerals, proteins, fats, sugars, etc. are also the main nutrients. It can be made into juice, jam, canned food, pickled, hot and sour kimchi and mango milk powder, candied fruit, etc. Dried fruit is good for stomach, vomiting, and stun. Therefore, mango is effective for vertigo, Meniere's syndrome, high blood dizziness, nausea and vomiting. The dried mangoes produced by the dried mango production line not only retain the flavor of mango, but also extend the shelf life of mangoes.
Dried mango processing line quality assurance:
Chenfei Machinery Vision is committed to building a world-renowned enterprise in the world's food, fruit and vegetable, dairy, beverage equipment production line turnkey project overall solution. The core components of the dried mango production line are basically imported or domestic first-line brands: so the quality and equipment stability is relatively high, and the mechanical after-sales service has always been better in the industry.
1.The motor of Chenfei’s processing machine is basically ABB, Siemens and Jiangsu Dazhong.
2.Stainless steel is from Zhangjiagang Pohang Stainless Steel Co., Ltd. (joint venture)
3.The water pump is from Nanfang and the centrifugal pump is from Yuanan.
4.Electrical cabinet and PLC control system: Siemens PLC touch screen, switch and AC contactor electrical protection is Schneider, intermediate relays are Honeywell.
5.The 304 pipes we use for the pipeline is from Yuan'an, the cables are all good cables.
Dried mango processing line technology advantages:
The preparation method of the dried mango production line processing production line comprises the following steps:
1. Mango as a raw material;
2. Ripening the mango;
3. Washing the peel of the mango after ripening;
4. Peeling the mango;
5. Pretreating the peeled mango;
6. The mango after the pretreatment is sliced to obtain a mango slice;
7. The taste of the mango pieces is coded;
8. Color-protecting the mango pieces after the taste is tasted;
9. Drying the mango pieces after the color protection to obtain dried mangoes;
10. Softening the dried mango;
11. Packing the dried mangoes after softening.
Mango dry production line equipment list
Raw materials: around 24 tons / DAY
Requires plant area: 5000
Required power: 200KW
Requires water: 100 tons / day
Boiler: 3T
Need workers: about 100 people
Finished product: 4 tons / DAY
Packing: 40 kg / box (wholesale) and 125g zipper packaging
Production line core equipment parameters:
No | Product Name |
A: Pre-processing equipment | |
A1 | Meat Cleaver |
A2 | Hoist |
A3 | Continuous color protection machine |
A4 | keg |
A5 | Vacuum drawing equipment |
A6 | Hoist + Hopper |
A7 | Vacuum immersion sugar unit |
A8 | High speed sugar can |
A9 | Centrifugal pump |
A10 | Mesh belt conveyor |
A11 | Centralized control system |
B: Drying equipment | |
B1 | Hot air drying room |
B2 | Cold air drying room |
B3 | Drying car |
B4 | Tray |
B5 | Nylon mesh |
B6 | Padding |
B7 | Paving workbench |
B8 | Workbench |
C:Packaging equipment | |
C1 | Belt conveyo |
C2 | Z type vibration hoist |
C3 | 10 head combination scale |
C4 | Stainless steel platform |
C5 | Bag packaging machine |
C6 | Conveyor |
Flow chart:
Raw fruit -- ripening -- peeling, splitting -- color protection -- vacuum soaking sugar -- drying -- dehumidification -- picking -- packaging
Question and answer:
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely
4) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
After sale service
1. Welcome to consult us for offer and technical solution:
2. free design workshop layout as workshop space.
3. free check raw material quality report to match suit water treatment system.
4. Engineer install and train client how to use and maintain machine
5. one year guarantee