Product Name | Stainless Steel Coil/strip |
Length | as required |
Width | 3mm-2500mm or as required |
Thickness | 0.03mm-300mm or as required |
Standard | AISI,ASTM,DIN,JIS,GB,JIS,SUS,EN,etc |
Technique | Hot rolled / cold rolled |
Surface Treatment | 2B or according to customer requirement |
Thickness Tolerance | ±0.02mm |
Material | 201, 202, 301, 302, 303, 304, 304L, 304H, 310S, 316, 316L, 317L, 321,310S 309S, 410, 410S,420, 430, 431, 440A,904L |
Application | It is widely used in high temperature applications, medical devices, building materials, chemistry, food industry, agriculture, ship components. It also applies to food, beverage packaging, kitchen supplies, trains, aircraft, conveyor belts, vehicles, bolts, nuts, springs, and screen. |
MOQ | 1 ton , We can accept sample order. |
Shipment Time | Within 3-5 workdays after receiving deposit |
Export Packing | Waterproof paper, and steel strip packed. Standard Export Seaworthy Package.Suit for all kinds of transport,or as required |
Capacity | 300,000 tons/year |
PRODUC TDISPLAY SURFACE TREATMENT
SURFACE FINISH:NO.1
Applieution:Industrial tunk, chemnicnl industriel equipmnent, thieker from 8.0mm 10.0mmn. It does not need to have a shiny surface.
SURFACE FINISH:2D
Application: Used for deep stamping, such as automobile compontents, water pipes, ete. General wood, deep druwing wood.
SURFACE FINISH:2B
Applieation:Such a8 tableware, building materials,etc. After surface treatment to improve mechanical properties, it can meet almost all purposes.
SURFACE FINISH:NO.4
Appliceatior:Usedl for bath bubble, lmilding interior and exterior decoration mnterinls, cloetricnl prodluets, kitehen equipment and food equipment, ete.
SURFACE FINISH:HL
Application:M ainly used for decorative materials,elevators, building doors, panels and so on.
SURFACE FINISH:BA
Application:Used in household appliances, mirrors, kitchen equipment, decorative materials, ete
SURFACE FINISH:8K
Applieation:Mirror, decorative board
Q: How long is your delivery time?
A: For Stocks, we can send the goods to loading port within 7 days after receiving the deposit ;For production period,it usually needs about 15 days ~30 days after receiving the deposit.
Q: Where's your factory?
A: Our factory is in Guang dong afforded enough production ability and earlier delivery time.
Q:Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.