Aluminum coil coating line with loading trolley, centering machine
Hand-feeding---uncoiler unit---shear---sewing machine---front looper---alkaline washing unit---water washing unit---hot-air blowing device---chemical roller-coating machine---chemical-coating drying furnace---prime-coat roller-coating machine---prime-coat curing furnace---air cooling---water cooling---drying---top-coating roller-coating machine---top-coating curing furnace---air cooling---water cooling---drying---printing machine unit(preserved location)---over-coat roller coating machine---over-coat curing furnace---hot film laminating machine---over coat(laminated film)forced cooling room---drying---cold film laminating machine---rear looper---shear servo coiler unit---hand blanking
Material | galvanized steel strip or common steel steel strip |
Line speed | whole line speed 40-150m/min |
End product weight | 3,500-15,000kg/coil |
Outer Dia. of coil | φ900-1,800mm |
Inner Dia. of coil | φ508/φ610mm |
Thickness of steel strip | 0.2-1.2mm |
Width of steel strip | 600-1,250mm |
Energy | produce gas/natural gas/blast furnace gas,steam and electricity |
Thickness of color plate | thickness of the frontsingle layer dry film can be adjusted between 10-20μm thickness of the reverse single layer dry film can beadjusted between 5-10μm |
Color plate quality | comply with the requirement ofnational standard GB/T12754-2006 |
Coiling staggered layer | one side≤1.0 mm |
1. Do you offer custom service?
Of course, most of our machines are built according to customers specifications, using top brand name components.
2. How to ensure the quality?
*In order to ensure the accuracy of each part, we are equipped with a variety of professional processing equipment and we have accumulated professional processing methods over the past years.
*Each component before assembly needs strictly control by inspecting personnel.
*Each assembly is in charged by a master who has working experience for more than 5 years.
*After all the equipment are completed, we will assembling all the machines and run parts testing for at least 12 hours to ensure the stable running in customers' factory.
3.Do you provide after-sales service?
*After finish the production, we will debug the production line, take photos, videos and send them to customers via mail or instant tools.
*After the commissioning, we will package the equipment by standard export package for shipment. We will arrange our engineers to customers' factory to do the installation and training.
*Engineers, sales managers and after-sales service manager will form a after-sales team, online and off line, to follow the customers' project.