Galvanizing Line Equipment with excellent technology
0.8~2.5mm*1350mm 250,000TPY ( steel metal)
Steel is a mainstay in modern construction and has been since the beginning of the industrial revolution. Engineers, architects and construction professionals trust the strength and durability steel provides; however, as soon as steel is exposed to the environment, it begins to corrode. Hot dip galvanizing protects steel from corrosion due to a metallurgical bond that occurs when steel is submerged in molten zinc. The reaction creates intermetallic layers, harder than the base steel itself, resulting in an extremely abrasion resistant coating that can last for decades.
Beijing JJRS Technology Development Co., Ltd. registered in national high tech park-Beijing Economic and Technological Development Zone, is high-tech enterprise specialized in the complete set of metallurgical equipments, intensive processing of steel strip and metal surface coating engineering project, with the integration of mechanism, optics, electric and hydraulic pressure.
JJRS is professional on turn-key projects, from general planning, designing, to manufacturing, installing, commissioning and servicing. Besides, our business also covers single equipment’s designing, manufacturing and installing, as well as electric transmission, control system and spare parts. All basing on these supporting businesses, we mark out a developing strategy that taking metal strip intensive processing and color coating production lines as main, and the associated industry products as supplement.
Two Core of " JJRS-Sendzimir"
Compared with the traditional technology, " JJRS-Sendzimir" method can greatly increase productivity. For its:
Technology Patent of " JJRS-Sendzimir"
The launch of " JJRS-Sendzimir" depends on a number of technology patents innovated by ourselves.
Item | Caculation | Time(h) |
Daily working rate |
| |
Annual working time |
| 8 760 |
Scheduled repairs and roll changing |
| |
Available working time | Working time - maintenance time | |
Availability | | |
Performance and speed factor | | |
Total annual working time | available working time * availability * performance and speed factor | 7 586 |