Specifications
Brand Name :
Gasregen
Model Number :
G200/G300
Certification :
Quality Management System Certificate
Place of Origin :
China
MOQ :
From 1 set
Price :
According to the equipment model
Payment Terms :
T/T
Supply Ability :
Available upon request
Delivery Time :
1-2 months
Packaging Details :
Depending on product volume
Description

Pneumatic Butterfly Valve,Butterfly Valve,Control Unit,Valves,Nitrogen Recovery System

Mew block
Mew block Mew block is the equipment fixed in the structural frame or containerized frame, and the whole combination of pipes, valves, pumps containers, instruments, etc. are installed in it. According to the process flow, spatial direction, and spatial arrangement of the module, the process equipment, process piping, high structure, or containerized frame inside the pew block are reasonably planned and arranged according to the relevant standards.
Shovel block is equipment fixed in structural frame or containerized frame, in which pipelines, valves, pumps, containers, instruments, etc., are installed in a whole combination. According to the process flow, spatial direction and spatial arrangement of the block, the process equipment, process pipelines, high structure, or assembled frame in the block are reasonably planned and arranged according to the relevant standards, so as to make it into a functional, modularized, and fixed whole equipment. Skid-mounted equipment is modularized, skid-mounted, and factory-mounted as the core, which can improve the quality of the project, shorten the project duration, significantly reduce the overall cost of the project, and improve the safety and environmental protection. Skid-mounted blocks can be divided into water-shovel blocks, water-injection-shovel blocks, dosing-shovel blocks, air-separation oxygen and nitrogen-shovel blocks, natural gas regulating-shovel blocks and so on; according to the type of structure they are divided into hostile frame-type and container-type skid-mounted blocks, and so on. Shovel plants can be installed indoors and outdoors, at different heights, according to the needs.

Working Principle of Hydrogen Dryer
The working principle of hydrogen dryer can be divided into the following steps:
1, adsorption: hydrogen through the drying tower, the desiccant adsorption of water and other impurities, so that the hydrogen is purified.
2,Heating: the adsorbed impurities need to be heated and desorbed for further drying. The role of the heater is to heat the hydrogen to improve the drying effect.
3,Condensation: The heated hydrogen needs to be cooled through the condenser to make the unevaporated impurities and water droplets condense down for further filtration.
4,Filtering: The condensed hydrogen gas also needs to pass through the filter to filter out the particulate impurities, in order to ensure the quality of the final output of hydrogen.

Heating Purified Argon Recovery Unit Filtration Skid Mounted Equipment

Hydrogen dryer is an important industrial equipment, which can effectively improve the purity of hydrogen and provide high quality hydrogen for various industries. Although there are some cost and energy consumption problems, with the continuous development of technology, the hydrogen dryer will continue to improve and better serve the industrial production.
--------------------------------------------------------

Send your message to this supplier
Send Now

Heating Purified Argon Recovery Unit Filtration Skid Mounted Equipment

Ask Latest Price
Brand Name :
Gasregen
Model Number :
G200/G300
Certification :
Quality Management System Certificate
Place of Origin :
China
MOQ :
From 1 set
Price :
According to the equipment model
Contact Supplier
Heating Purified Argon Recovery Unit Filtration Skid Mounted Equipment
Heating Purified Argon Recovery Unit Filtration Skid Mounted Equipment

Shanghai Vision Energy Technology Co., Ltd

Verified Supplier
3 Years
shanghai, shanghai
Since 2014
Business Type :
Manufacturer
Total Annual :
5000000-10000000
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement