Fire Tube Warranty 24Months Natural Gas Steam Boiler with Low Pressure
Product Description
Excellent Structure
|
Two Fire-Passes | Automatic Control | Automatic Water Feeding |
New Wet-Back Design | Automatic Water-Level Control | ||
Corrugated Furnace | Automatic Pressure Regulation | ||
Corrugated Fire-tube | Automatic Over-Pressure Relief | ||
Quality Burner
|
European Brand (BALTUR) | Visible Operation | Visible Working Pressure |
Complete Combustion System | Visible Fuel Consumption | ||
Automatic Ignition | Visible Working Pressure | ||
Two-Stages Fire | Visible Steam Temperature |
Standard Features
1. Durability
2. Good Quality. Each unit is tested and inspected and registered with the National Board of Boiler and Pressure Vessel Inspectors.
3. High Efficiency. LHS vertical boilers is designed for optimum fuel efficiency.
4. Low Maintenance
5. Easy Access
6. Compact Structure
Item/Umit/Model | Steam Boiler | ||||||
LHS0.3- | LHS0.5- | LHS0.75- | LHS1- | ||||
0.7-Y.Q | 0.7-Y.Q | 1.0-Y.Q | 0.7-Y.Q | 0.7-Y.Q | |||
Nominal Capacity | Kg/h | 300 | 500 | 500 | 750 | 1000 | |
Nominal Steam Pressure | Mpa | 0.7 | 0.7 | 1 | 0.7 | 0.7 | |
Nominal Steam Temperature | ℃ | 170 | 170 | 184 | 170 | 170 | |
Feed Water Temperature | ℃ | 20 | |||||
Thermal Efficiency | % | >90 | |||||
Water Volume | L | 660 | 770 | 770 | 1160 | 1310 | |
Steam Outlet | DN | 40 | 40 | 50 | |||
Inlet | DN | 25 | 32 | 25 | 40 | ||
Sewage Valve | DN | 40 | |||||
Safety Valve | DN | 40 | 40/40 | ||||
Smoke Crossing | mm | 219 | 300 | ||||
Base Dimensions | mm | 1190*1190 | 1450*1450 | 1620*1620 | |||
Dimensions | Length | mm | 1450 | 1500 | 1750 | ||
Width | mm | 1450 | 1500 | 1750 | |||
Height | mm | 2250 | 2120 | 2250 | 2470 | ||
Transport Weight | T | 1.4 | 1.78 | 2 | 2.3 | 2.46 | |
Gas Pressure | Kpa | 1.5-3.5 | 4-8 | ||||
Gas Pipe | DN | 32 | 40 | 50 | |||
Fuel Consumption | |||||||
L.N.G | Nm³/h | 23.5 | 39.2 | 58.8 | 78.4 | ||
L.P.G | Nm³/h | 9 | 15 | 22.5 | 30 | ||
C.G | Nm³/h | 50 | 83.3 | 124.9 | 166.6 |
After-sales Service:
1. Engineers available to service machinery overseas.
2. We can guarantee 3 years for the boiler host,and also warranty 2 years for auxiliary boiler.
3. If there is any problem in install and use process, fell free to contact us and we will get back to you in first time to solve the problem
4. If our reply is still no solution to boiler problems, we will send engineers on-site service.
Packaging & Shipping
1. Packing way: nude packaging for boiler main part and wood box packaging for boiler accessories.
2. Container packing: 20 container
3. All goods will be reforced after packing into containers.
4. We have stable shipping company to cooperate. They will confirm the safty of the goods.
5. Shipping way is different according to customer's country. Mostly by sea. Some country by train.