1500KW 10.5KV Medium Load Bank To Prevent the Generator Carbon Deposition
Control Function:
1. Load testing: load power that not beyond the rated power, testing and display stable state 3 phases voltage, current, active power, frequency, working time, etc of generator sets.
2. Load/unload with one key: Whether manual control, remote control or software control, user can preset the power, then press load master button. Load bank loaded according to preset power to avoid load fluctuation during the power changing.
3. Control Pattern: user can choose local control and intelligent control.
4. Local Control: There is local control panel with several power steps; user can load/unload by button. Each gear switch with indicator light.
5. Intelligent Control: Through data processing software in PC, user can make automatic load, to display, record and manage the testing data, to form curves, tables, also to print them.
6. Local meter display data: local meter can display 3 phases voltage, current, active power, frequency and so on.
Application:
used for the testing of output power and loading capacity. The equipment uses graded loads to make any combination based on testing needs.The system uses air cooling with overvoltage,low voltage,overheat and short circuit warning functions to ensure the safety and reliability of equipment.
Specification | |
Rating voltage/frequency | 10.5KV/50Hz |
Max Load Power | Apparent Power: 1500kW |
Load Resolution | step:100KW |
Power Factor | 1 |
Load Tolerance | ±5% |
Fan Control Power | 190V/380V,50Hz/60Hz |
Wire Connection | Load bank input——Copper bar |
Control power input——Connector-bar | |
Max Protection Grade | IP56 |
Way of Working | Continuous Working |
Cooling | Forced air cooling, horizontal inlet air and upwards exhaust cooling |
Transportation | Hoisting |
Color | RAL7032 |
Dimensions | 4000*2438*2591 |
Weight | 6000KG |
Accessories | Switch: ABB, Siemens and Schneider, PLC: Panasonic and Siemens; |
Operating Environment Parameter | |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Fullde electric is promoted to the final of Chinese innovation
The Board of Chinese innovation and Entrepreneurship competition issued an announcement, published the list of companies that have been selected to the final of the 5th Chinese innovation and entrepreneurship competition and the 4th technology entrepreneurship innovation competition.
Fullde goes to the final, will display Fullde’s elegant demeanor in the highest level of innovation and entrepreneurship competition in China.
The innovation and entrepreneurship competition was organized by MOST (Ministry of Science and Technology), Financial department, education department and Chambers of commerce and industry, is the highest level completion in China.
Fullde always take the best service provider of electric system globally as the target since it was founded. It has now 10000 square meters production base, staff over 400; Fullde highly pay attention to the technology development and intellectual property establishment, own a professional team of experts, we have won over 100 pieces of patent for invention, and the approval of National High Tech Enterprise as well.
Fullde kept improving the product technology, reached a lot of great breakthroughs; We have a series of complete electric equipment such as Neutral grounding resistor, High-Low voltage Switch cabinet, ARD, Braking resistors, Intelligence Testing Load etc.