Specifications
Warranty :
Lifetime
After-sale Service :
Online technical support, Onsite Inspection, Free spare parts, 24 hours online service
Project Solution Capability :
graphic design, 3D model design, Cross Categories Consolidation
Application :
Park, Outdoor
Design Style :
Traditional
Place of Origin :
Shandong, China
Brand Name :
TL
Model Number :
COO1
Type :
impounding drainage board
Product name :
impounding drainage board
Material :
Virgen HDPE
Keyword :
HDPE
Color :
Black
Function :
Protect Turf
Usage :
Greening System
Height :
38mm 48mm 68mm
Advantage :
Easy Set
Package :
Standard Package
Packaging Details :
*Plybag or follow customers' demand.
*Highly keep away from fire and high temperatures.
*Logo marked is accepted on the package.
Supply Ability :
10000 Square Meter/Square Meters per Day
MOQ :
1000 square meters
Price :
$1.20/square meters 1000-4999 square meters
Description
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Product Customized
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
type
material
height of projection(mm)
pressure load(kpa)
size(mm)
puncture strength(N)
H20
HDPE
20
300
500*500
350
H25
25
300
350
H30
30
300
350
H40
40
300
350
H50
50
300
350
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
product instruction
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
The installation and construction of the storage and drainage board is directly laid on the completed fine stone concrete protective layer as shown in the above figure, and the board adopts the buckle lap method. General construction technology 1. Process flow Base acceptance a planning spring line empty laying storage and drainage plate a buckle and lap buckle a self-inspection acceptance a inspection acceptance a laying poly cool non-woven fabric a self-inspection acceptance a inspection accep- -tance. 2. Operation key points and technical requirements (1) To keep each piece of drainage plate buckle. (2) The non-woven fabric is tightly bonded to avoid the body entering the drainage channel and blocking the drainage 3. Backfill method In order to prevent the destruction of the storage and drainage system by the earth truck, the backfill needs to be back- -filled from the periphery to the inside, the process is as follows (1) the non-woven fabric is first laid in the backfill, and the non-woven fabric is accepted after the laying and then backfilled. (2) During the construction process, pay attention to the protection of the storage and drainage plate, and the vehicle can be walked on it after the backfill thickness is 2500mm.
Packing Method
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding drainage board packaging is generally the use of non-smoked tray, if there are special requirements can be packed in cartons, carton packaging needs to be calculated
separately.
Factory Show
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
FAQ
Q1: Are you trading company or manufacturer? A:We are officially licensed MANUFACTURER specializing in the research, production and supplying of geosynthetics with 20 years experience Q2: How about the quality of your products? A: We have professional and advanced brand machine production line and quality control center. Each batch of products will be sampled before package and there also has final inspection before shipment Q3: Can you provide sample? A:Yes,we can offer free samples of some items for quality evaluation. Q4: Can you accept small order? A: Yes.Our minimum order quantity is 1000㎡ Q5: Do you accept customized design order? A: Yes.We welcome customized design orders Q6: What is your lead time? A:General within 7-15 days, large order can be negotiated Q7: What's your delivery term? A: We can accept EXW, FOB, CIF etc (follow customers' request) Q8. What is the payment way? A: Online Bank Payment,T/T,L/C,D/P D/A,PayPal,Western Union
Send your message to this supplier
Send Now

Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure

Ask Latest Price
Warranty :
Lifetime
After-sale Service :
Online technical support, Onsite Inspection, Free spare parts, 24 hours online service
Project Solution Capability :
graphic design, 3D model design, Cross Categories Consolidation
Application :
Park, Outdoor
Design Style :
Traditional
Place of Origin :
Shandong, China
Contact Supplier
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure
Impounding Drainage Board for Park Construction in 's Water Conservancy Infrastructure

Taian Tenglu Engineering Materials Co., Ltd.

Active Member
2 Years
shandong
Since 2017
Business Type :
Manufacturer
Total Annual :
5000000-10000000
Employee Number :
101~200
Certification Level :
Active Member
Contact Supplier
Submit Requirement