ENTERPRISE MISSION: GIVE CLIENTS HAPPINES! Our company, Xinguangzheng (XGZ) Group, has six factories, a production area of 150,000 square meters, 16 million dollars in registered capital and a yearly production capacity 50,000 tons. Design - model - procurement - production - packaging -...
ENTERPRISE MISSION: GIVE CLIENTS HAPPINES!
Our company, Xinguangzheng (XGZ) Group, has six factories, a production area of 150,000 square meters, 16 million dollars in registered capital and a yearly production capacity 50,000 tons. Design - model - procurement - production - packaging - delivery - erection - after-sales for steel structure products will be supplied for you in one-stop service.
Brand name | XGZ |
Place of Origin | Qingdao, China |
Frame grade | Q355/Q235B/ASTM ETC. |
Surface treatment | Paint/Hot dip galvanization |
Products | Steel frame/crane/roof and wall panel/insulation/ window/door/skylight/ ventilation/ceiling/solar panel/Louver/Mezzanine/ curtain wall ETC. and Customized products |
Delivery time | 20-60 days after shop drawing confirmed |
Guarantee period | 5 years |
Service life | 50 years |
MOQ | 1,000 square meter |
Fixed packing, loading, transportation, unloading precautions:
(1) Lifting large must be responsible for the use of the appropriate fixture, strictly abide by the lifting rules, to prevent vibration, impact, deformation or damage, fall and other situations in the lifting process.
(2) When loading the car, there must be special supervision, check the car number and packaging, pile the car firmly, and increase the necessary binding components loose, to prevent loss.
(3) Maintain stability in the transportation process. Trained pilots and escorts must be responsible for the transportation of long, wide and high objects when the vehicle is in transportation, and signs must be arranged on the vehicle.
(4) Rough handling is strictly prohibited. Loading and unloading personnel should be familiar with the weight and size of each component, and check the harness and rigging of the horse to prevent accidents.
(5) Members shall arrive at the construction site and organize the unloading and stacking areas in time.
(6) When crawler crane is carrying components, attention should be paid to the surrounding terrain and air conditioning conditions to prevent the overturning of crawler crane and component collision.
Welcome your inquiry!