Specifications
Brand Name :
Gofine
Model Number :
G120
Certification :
IOS9001
Place of Origin :
china
MOQ :
1 Set
Price :
Negotiation
Payment Terms :
L/C, T/T, Western Union, MoneyGram
Supply Ability :
20 stations/monthly
Delivery Time :
5-8 Work days
Packaging Details :
nude cargo
Name :
Manure Fermentation Tank
volume :
120M3
capacity :
13 to 15 M3/D
power :
18.9KW
Materials :
carbon steel
Machine Type :
Towable
Description

120M3 Compost Fertilizer Production Manure Fermentation Tank

Introduction of Manure Fermentation Tank

The organic fertilizer fermentation equipment is a new generation of equipment developed by our company. It has changed the traditional fermentation process of the pond method, improved the production efficiency and produced a step of organic fertilizer products.

Parameters of Manure Fermentation Tank

Model G32 G70 G120 G280
volume 32M3 70M3 120M3 280M3
capacity 2-3.5M3/D 5-7M3/D 13-15 M3/D 24-30 M3/D
power 18.9KW 31KW 46.5KW 110 KW

Features of Manure Fermentation Tank

It has the characteristics of short fermentation period, cover small area and friendly environment. The closed aerobic fermentation tank is composed of nine systems: feed system, silo reactor, hydraulic drive system, ventilation system, discharge system, exhaust and deodorization system, panel and electronic control system. Livestock and poultry manure can choose not to add or add a small amount of excipients and microbial inoculum according to their moisture content and heat value. The feeding system is put into the silo reactor, and the feces are agitated by the impeller blades of the driving mechanism to form a continuous agitation state in the silo. At the same time, the aeration and heat recovery devices of the equipment provide dry hot air for the aeration impeller blades. A uniform hot air space is formed at the back of the blade, which is in full contact with the material for oxygen supply, heat transfer; dehumidification and ventilation. The air is collected and treated from the bottom of the silo through the stack. The temperature in the tank during fermentation can reach 65-75°C, which can ensure the killing of various pathogens. The moisture content of the material after fermentation is about 35%, and the final product is safe and harmless organic fertilizer. The reactor is a closed whole. After the odor is collected through the top pipeline, it is washed and deodorized by water spray and discharged to the standard.

Equipment Working Principle:

The equipment of thermophilic aerobic fermentation tank is equipped with oxygen concentration sensor and temperature sensor. The oxygen delivery and temperature are automatically adjusted by PLC signal. Under the action of ventilation, oxygen filling and stirring, the fermentation temperature of materials is controlled between 55 and 65 degrees Celsius to reach the optimum temperature for material fermentation. At this temperature, a large number of pathogens and parasites in the stack can be killed and harmless. Purpose of treatment. Some of the treated materials are mixed with new materials as reflux materials, and most of them are sold as organic fertilizers after packaging to realize resource utilization. The odor produced during fermentation is discharged into deodorizer through collection system to avoid secondary pollution. The system is equipped with electrically assisted heating to ensure that fermentation conditions can be quickly reached at low temperature and continuous production can be ensured at low temperature.

Send your message to this supplier
Send Now

120M3 Compost Fertilizer Production Towable Manure Fermentation Tank

Ask Latest Price
Watch Video
Brand Name :
Gofine
Model Number :
G120
Certification :
IOS9001
Place of Origin :
china
MOQ :
1 Set
Price :
Negotiation
Contact Supplier
video
120M3 Compost Fertilizer Production Towable Manure Fermentation Tank

Zhengzhou Gofine Machine Equipment CO., LTD

Verified Supplier
6 Years
henan, zhengzhou
Since 2015
Business Type :
Manufacturer, Distributor/Wholesaler, Agent, Exporter, Seller
Total Annual :
3000-6000
Employee Number :
80~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement