Steel 20CrMnTi 2 / 3 Pieces Post Tensioning Wedge Anchor For Prestressed Concrete
Types of Wedges
3-of Wedges
The 3-piece anchor wedges are used on permanent anchors or anchors requiring loading.
2-Piece Wedges
The 2-Piece anchor wedges are used in higher stress applications where the anchor is loaded and simply locked off, typical to temporary applications.
Anchorage Wedges Features:
1. 3.8mm, 4mm, 5mm, 7mm, 9mm, 15mm and so on
2. Lock for steel wire for precast concrete line
3. Good price, durable quality, recycle use
Anchor Wedges Usage
This kind of anchorage is used in pre-tensile production, used for different size of steel wire in precast hollow core slab factory, beam and lintel making factory and so on.
Application
Many tasks in the field of civil engineering including bridges, buildings and industrial construction projects demand for the application of pre-stressed or post-tensioned concrete members.
Feature of wedge
1. Flip flop wedges teeth is sharp and clean, easy to clamp the strand.
2. Flip flop wedges can matched for single-hole, multi-hole, round and flat anchor head.
3. Flip flop wedges has high anchor efficiency and good performance.
4. Customized accepted.
Product Details
Product Name | Post Tensioning Wedge Anchor |
Material | 20CrMnTi |
Standard | GB/T14370-2015 |
Length | 40±1mm |
Diameter | φ28mm |
Hardness | 78~85 HRA |
Tensile Strength | 1860Mpa |

Our Service
1. The most professional production and sale team, can give you the most professional on the products.
2. Customs design is available.
3. Small sample is free.
4. All the questions will be replied in 24 hours.

FAQ
Q: How long is your delivery time?
A: Generally it is 15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample but not free and also the cost freight should be cover by client. We will return the sample's charge when you place your first order.
Q: What is your terms of payment ?
A: All by T/T. 30% deposit should pay before we begin produce, balance before shipment.