Precision Silica Sol Investment Casting Machinery Part
Product Details
Material | Ductile iron,Grey iron,Carbon steel,Stainless steel,Alloy steel,Heat resistant steel,BrassAluminum etc |
Unit Weight | 0.5kg~300kg |
Application | Automotive,Mining,Railway,Medical,Marine,Construction equipments,Mining ect. |
Standard | ASTM, DIN, ISO, BS, JIS. |
Certificate | ISO9001, TS16949 |
Process | Sand casting,Forging, Investment casting,Die casting,CNC machining, Stamping |
Finish | Powder coating,Painting,Shoot blasting,Hot galvanized. |
Quality control | Instrument and manual inspection for every shipment |
Production Process
Silica sol investment casting and water glass are the two primary investment casting methods now days. The main differences are the surface roughness and cost of casting. Water glass method dewaxes into the high-temperature water, and the ceramic mold is made of water glass quartz sand. Silica sol method dewaxes into the flash fire, and silica sol zircon sand makes the ceramic mold. Silica sol method costs more but has the better surface than water glass method.
Advantages:
1. High dimensional accuracy,good surface and quality
2. Better corrosion resistance
3. Less failure rate
Silica Sol Investment Casting production line:

Product Show

Quality Control

FAQ
Q1:How to enjoy the OEM services?
A1:Usually,base on your design drawings or original samples, we give some technical proposals and a quotation to you, after your agreement,we produce for you.
Q2.Which kind of file format you can read?
A2:3D drawing:Igs or step 2d drawing:pdf is workable
Q3:How can I get the quotation?
Drawing,material,quantity,if have special requirement about packing or surface treatment,tell me
Q4:Are you trading company or factory?
A4:We are manufacturer and welcome to visit our factory.We could give you one-stop price offer.
Q5:When can I get the samples and your main order time?
A5:For mould:about 3-5 weeks For mass production:normally 4-6 weeks depend on your quantity and technics we choosed.
Q6:What's your payment term?
A6: Mould:full payment before mould opening
Mass production:40% down payment,balance paid before shipment