Slope reinforcement wheel design Gunite Machine For Sale swimming pool
Gunite Machine For Sale
Problem solution of Gunite Machine For Sale:
The rotor, discharging elbow or feeding pipe is blocked | Aggregate particles are too large | If the feeding pipe is blocked, the machine should stop rotating, close the gas valve, remove the feeding pipe from the elbow, open the gas valve, blow out the storage of the rotor, and then check the feeding pipe, hit the blocked part with wooden sticks, vibrate or hollow out the blockage (note: Before disassembling the outlet elbow or pipeline, the pressure in the feeding pipe should be reduced to 0) finally, the feeding pipe is connected to the elbow and blown out with pressure wind. If the output distance is more than 40m, each 20m long pipeline should be processed separately. |
Parameters of Gunite Machine For Sale:
Technical | Parameters | ||||
Model | PZ-5 | PZ-6 | PZ-6F | PZ-7 | PZ-9/WSP |
Throughput(m3/h) | 5-5.5 | 6 | 6-7 | 7 | 9 |
Transport Distance (Tidal Spray) (m) | 200 | 200 | 200 | 200 | 200 |
Applicable Material (Cement/Sandstone) Ratio | 1:3~5 | 1:3~5 | 1:3~5 | 1:3~5 | 1:3~5 |
Applicable Material (Water/Ash) Ratio | ≤0.4~0.45 | ≤0.4~0.45 | ≤0.4~0.45 | ≤0.4~0.45 | ≤0.4~0.45 |
Aggregate size (mm) | φ20 | φ20 | φ20 | φ20 | φ20 |
Working Pressure (MPa) | 0.2~0.4 | 0.2~0.4 | 0.6~0.8 | 0.6~0.8 | 0.6~0.8 |
Feeding height (m) | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 |
Rotor speed (r/min) | 11 | 11 | 11 | 11 | 11 |
Motor Power (KW) | 5.5 | 5.5 | 7.5 | 7.5 | 7.5 |
Motor speed (r/min) | 960 | 960 | 960 | 960 | 960 |
Operation Method of Gunite Machine For Sale:
After the preparation work is finished, the mixing material can be added to the machine. The machine operator should first open the main valve, the valve of the upper air duct opens 1/3 circles, and then adjust the air pressure of the lower air duct (to the cyclone) to about 0.05-0.1 MPa (depending on the delivery distance). Then the sprayer opens the nozzle valve and gives the wet rock surface. At this time, the operator can start the machine and start shotcreting. Now the working pressure is about 0.2-0.4 MPa. According to the water-cement ratio of mixtures and the length of conveying distance, after adjusting and determining the wind pressure to the cyclone, the upper air pipe valve is opened again until there is no more material leakage at the machine outlet.
Pictures of Gunite Machine For Sale:
Construction Site and Warehouse of Gunite Machine For Sale: