Foundation Grout tunnel Construction Mobile Concrete Pump Price compact
Mobile Concrete Pump Price
Lubrication, cooling, heat dissipation system of Mobile Concrete Pump Price:
The mobile concrete pump is equipped with Y-8 mechanical manual lubricating oil pump, fill 32 mechanical oil, timing manual pressure oil, through THE HT type adjustable oil distributor into 3 channels, respectively to S tube swing valve two rotating shaft diameter with grease, in order to lubricate the sealing parts at the shaft diameter; Before use, "000" grease or cutting fluid should be added to the tank (solid cutting agent and water ratio 1: 50), one end of the tank is connected with the inner cavity of the cylinder, and the other end is connected with the hydraulic cylinder, which can be used for lubrication and cooling of the piston in the cylinder. The tank volume is 78L. After heat balance calculation, AH1012T air cooler can play a good cooling role on the whole hydraulic oil road.
Parameter of Mobile Concrete Pump Price:
Model | GS120-1 | GS120-2 |
Number of cylinder | 2 | 2 |
Material cylinder diameter | 120mm | 120mm |
Air cooler model | AH1012T-CA (AC380) | AH1012T-CA (AC380) |
Type of Gear Pump | GJ2050/L | GJ2050/L |
Rated pressure of gear pump | 20 MPa | 20 MPa |
Maximum outlet pressure | 3 MPa | 3 MPa |
Theoretical discharge | 7-9 m³/h | 7-9 m³/h |
Pump lift | 20m | 30m |
Distance of farthest conveying | 40m | 60m |
Maximum material diameter | 20mm | 20mm |
Tank volume | 78 Liter | 78 Liter |
Dimension size | 1895×726×1300 mm | 1895×726×1300 mm |
Weight | 700kg | 730kg |
Working process of Mobile Concrete Pump Price:
First of all, the concrete pump must be parked on flat, solid ground, absolutely not on soft ground, in order to avoid the inclination in the process of work.
Start the main motor for a short time operation, and observe whether the pressure gauge is normal. According to the length of the pipeline, before starting the construction work, we must first pump the water into the pipeline through the pendulum valve to lubricate the pipe wall. Then mortar, and finally concrete, work begins, and often run the test pump empty, with clear water pumping to confirm the smooth pipeline.
Pictures of Mobile Concrete Pump Price: