Specifications
Brand Name :
Tytion
Model Number :
BW50-5
Certification :
CE, ISO, SGS
Place of Origin :
China
MOQ :
1 set
Price :
Negotiable
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :
120 sets per month
Delivery Time :
3-5 working days
Packaging Details :
Wooden case package
name :
Pressure Grouting Machine
Working motor power :
5.5 KW
Rated Pressure :
5 Mpa
suction pipe diameter :
51 mm
out let pipe diameter :
32 mm
model :
BW50-5
cylinder diameter :
80 mm
Piston stroke :
90 mm
Description

Single cylinder piston type Pressure Grouting Machine small type

Pressure Grouting Machine

Work Preparation of Pressure Grouting Machine:

After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check the sufficiency of lubricating oil in the gearbox (lubricating oil should be injected into the gearbox to the viewing hole of the oil window when it is first used).
2. Check the fastening and loosening of all parts, especially the screw tightening of rubber piston locking nut, cross head and tie rod. Whether the moving parts are blocked or not, and whether the rotation is flexible.
3. Check whether the filter, suction pipe and discharge pipe are unblocked.
4. Check whether the joints of the pipelines are firm and tight, whether there is leakage or leakage.

Technical parameters of Pressure Grouting Machine:

Cylinder number 1
Bore diameter 80mm
Piston stroke 90mm
Diameter of suction pipe 51mm
Diameter of outlet pipe 32mm
Motor power 5.5 kw
Main shaft speed 1440 r/min
Working pressure 5 Mpa

Structure of Pressure Grouting Pump:

Chemical Grout Injection Pump is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.

Preparations before pumping of Pressure Grouting Pump:


After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.

Pictures of Pressure Grouting Pump:

Piston Cement Pressure Grouting Machine Single Cylinder Small Grout Pump

Piston Cement Pressure Grouting Machine Single Cylinder Small Grout PumpPiston Cement Pressure Grouting Machine Single Cylinder Small Grout Pump

Send your message to this supplier
Send Now

Piston Cement Pressure Grouting Machine Single Cylinder Small Grout Pump

Ask Latest Price
Brand Name :
Tytion
Model Number :
BW50-5
Certification :
CE, ISO, SGS
Place of Origin :
China
MOQ :
1 set
Price :
Negotiable
Contact Supplier
Piston Cement Pressure Grouting Machine Single Cylinder Small Grout Pump

Henan Tytion Machinery Co., Ltd.

Active Member
4 Years
henan, zhengzhou
Since 2016
Business Type :
Manufacturer, Trading Company
Total Annual :
2000000-3000000
Employee Number :
50~100
Certification Level :
Active Member
Contact Supplier
Submit Requirement