Direct Factory Price Custom Made Lamp Shades Plastic Spare Parts
We have more than 30 engineers(include industry/. Most of them are with rich making experience. All of our technology directors are having at least 10 years experience.
Among them, 5 senior engineers even have more than 25 years experience.
Our mold engineers team focus on offering customers the most optimal solution for their projects. WE ARE NOT ONLY MAJOR IN MOLDS, WE ARE PROFESSIONAL IN DIFFERENT PROJECTS!
That was the reason why we never fail in any projects!
Mold Material | S136, 718, 738, P20, NAK80 |
Color | PANTONE or RAL |
Plastic Material | PVC/PA66/PC/PE/POM/PMMA/ABS/TPU/TPE/PE/PP.ETC. |
Mold Cavity | multi-cavity or single cavity |
Mold life | 300,000-500,000 shots |
Mold Runner | hot runner/cold runner |
Mold Base | LKM, HASCO, ETC. |
Design Software | Solidworks, Pro-E, CAD |
Certification | ISO9001: 2015 |
ABOUT OUR Quality Control system for injection molding production
1st inspection:
QC inspects the first piece product made coming out from our machine.
QC will do over check according to the parameters list and critical dimensions requested by customers,to decide if it can go ahead for production.
2nd inspection:
During processing, our IPQC will check the injection molded parts every
2 hours, ensure no any rejects
3rd inspection:
FQC will check the products before sending to the warehouse
4th inspection:
OQC will check again before shipping
Packing | Normally packed by carton + poly bag in side |
Packed by wood/ plastic pallet | |
Customized pack for special products or customized packed as inquiry | |
Shipping | Large order : ship by boat (EXW/ FOB / CIF term) |
Small pack or Urgent product : sent by Express such as DHL,UPS,FedEx,TNT. | |
Lead time | Tooling : 15-30 days |
Sample: 3-5 working days | |
Production : 5-15 working days | |
Shipping : 30 days by boat ; 3-5 working days by express |
Welcome to Get a Quote