Custom-Made Milling Service Micro Lathe Precision Automatic Brass Small Titanium Other Vehicle Parts Accessories Turning Plate
| 1) AL1060, AL6061, AL6061, AL5052 2) Steel, mild steel, SPCC 3) SS201, SS303, SS304, SS316, SS316L 4) SPTE, galvanized sheet 5) Brass, copper 6) ABS, PP, PE, PC, POM |
| Anodized, powder coating, lacquer coating, black oxide, printing, matte, glossy, textured |
| 1) According to customers' drawings 2) According to customers' samples |
| step, dwg, igs, pdf |
| ISO 9001:2015 & IATF 16949 |
| T/T, L/C, Trade Assurance |
FAQ
Q1. Are you a factory or trade company?
We are a factory located in 6th Building, No 51, Nanhuan Ave, Gongming, Shenzhen, 518106, China.
Welcome to visit our factory.
Q2. What kind of production service do you provide?
Mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.
Q3. How about the lead time?
Mold: 3-5 weeks
Mass production: 3-4 weeks
Q4. How about your quality?
♦We have got ISO9001:2015 and IATF16949 certificates.
♦We will make the operation instruction once the sample is approved.
♦We will 100% inspect the products before shipment.
♦Transactions can be through Alibaba's trade assurance.
Q5. How long should we take for a quotation?
After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.
Q6. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.
Q7. What is your payment term?
Mold: 50% prepaid, balance after sample approval.
Goods: 50% prepaid, balance T/T before shipment.
Our Services
After model and prototype are confirmed, it will be mold design and manufacturing, product injection and production assembly. We have strict production management and an excellent manufacturing team. Our experienced engineers and business development specialist will ensure that your industrial engineering, tooling engineering, project management by experienced engineers and efficient engineering discussion is available at anytime. We have excellent mold making lead time, some molds 40 days, some molds even 14 days, up to your parts design.


